BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2024 at 7:00 PM

Updated December 4, 2024

This is a service / maintenance or supply contract in Longmont, Colorado. Contact the soliciting agency for additional information.

The storm drainage rehabilitation and improvement program is responsible for the repair, rehabilitation and reconstruction of existing storm sewer & drainage system improvements. This program also is responsible for the design and construction of new drainage system improvements required to resolve on-going drainage issues. Needed storm sewer system and drainage improvements include: Gay St/Bross St Alley Improvements from 11th Ave to 14th Ave, 9th Ave Improvements from Bowen St to Bross St, 9th Ave Improvements from Emery St to Collyer St, Spruce St Improvements from Sunset St to Bowen St, 3rd Ave Improvements from Francis St to Bowen St, Atwood St Improvements from 4th Ave to 8th Ave, Roosevelt Park Drainage Improvements, Dry Creek from Bowen St to S Pratt Pkwy and Industrial Circle - Beckwith Ditch Realignment. This program may also include the design and installation of storm water quality improvements (BMP's) related to the City's storm drainage system. Program project priorities may change as system wide inspection and/or condition information is updated or in an effort to coordinate with other CIP Projects. As of December 3, 2024, this project is included in the City of Longmont's Fiscal Year 2024-2028 CIP. Further information regarding a design firm and timeline for construction has not yet been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,651,750.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.