Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 17, 2023 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Renton, Washington. Completed plans call for site work for a water / sewer project.
As of May 17, 2023, project was awarded to Laser Underground and Earthworks, Inc., awarded amount is $2,052,252.99 Site clearing including vegetation removal and the removal of approximately 40 trees to be reused as part of regulatory agency requirements. Installation of approximately 1,470 linear feet of 12-inch HDPE (High Density Polyethylene) sewer main. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any omissions, discrepancies or need for interpretation should be brought, in writing, to the attention of the Project Engineer. Written addenda to clarify questions that arise may then be issued. If a bidder has any questions regarding the project, the bidder may: Submit questions via email to inewman@rentonwa.gov. The bidder shall include "Bid Question - Thunder Hills Sewer Interceptor Rehabilitation" in the subject line. The work involved for this project takes place in a ravine adjacent to Thunder Hills Creek and therefore must conform to the requirements of permits issued by the Army Corps of Engineers, Washington State Fish & Wildlife and Washington State Department of Ecology. As regulated by these permits, the Construction Window for work within the wetted perimeter or ordinary high-water level (as shown on the construction plans) is from July 1 through September 30. The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: Site clearing including vegetation removal and the removal of approximately 40 trees to be reused as part of regulatory agency requirements. Any contractor connected with this project shall comply with all Federal, State, County, and City codes and regulations applicable to such work and perform the work in accordance with the plans and specifications of this Contract Document. The City reserves the right to reject any and all bids. Installation of approximately 1,470 linear feet of 12-inch HDPE (High Density Polyethylene) sewer main. Installation of approximately 10 sewer manholes along with reconnection of existing sewers to these manholes. Installation of approximately 800 linear feet of 10-inch CIPP (Cured-in-Place-Pipe) and 600 linear feet of 12-inch CIPP in existing sewer mainCCTV (Closed Circuit Television Video) inspection of new sewer main and CIPP installation.
Award
Water / Sewer
$2,052,253.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2023
June 20, 2023
Multiple Locations, Renton, WA
Related To This Project
Renton, WA
Bid Date: Apr 24 2023
Renton, WA
Bid Date: Jun 10 2021
Renton, WA
Bid Date: May 24 2023
Renton, WA
Bid Date: May 25 2023
Renton, WA
Bid Date: May 18 2023
Renton, WA
Bid Date: Jun 06 2023
Renton, WA
Bid Date: Jun 19 2023
Renton, WA
Bid Date: Mar 22 2023
Renton, WA
Bid Date: Mar 22 2023
Renton, WA
Bid Date: Feb 17 2022
Renton, WA
Bid Date: Mar 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.