Site work for a water / sewer project in Gustavus, Alaska. Completed plans call for site work for a water / sewer project.

Construct the Septage Holding Tank Facility as described in Appendix 1 - General Specifications and Scope of Work the attached engineers site plan and the section and plan view drawings showing details of the tank installation and specifications for the buoyancy restraint anchors. In providing a signature on this cover sheet, the Bidder agrees to all Terms and Conditions of this RFQ. The City of Gustavus would like to invite all interested parties to a pre bid conference to discuss the Septage Storage Facility capital project at 10am on Friday, March 31st, at City Hall. THE PERIOD OF PERFORMANCE for this work is from the date of award to July 31, 2023, unless otherwise agreed to with the City Project Manager. Throughout the period, the contractor is responsible for keeping and submitting monthly work logs and billing records to the City Treasurer. Contractor shall hold a current license as a General Contractor in the State of Alaska. 1) Excavate a test hole within the area where the first tank will be set to locate the water table and inspect the soil profile. 2) Assemble the buoyancy restraint anchors for the first tank according to the details in the section and plan drawings. 3) Clear the organics and topsoil from the site of the first tank to be installed and stockpile it. 4) Complete the tank excavation as deep as possible, but no deeper than eight feet, digging as close to the water table as possible without causing the banks to cave. Stockpile this material for backfilling the top half of the tank and building up the pump truck offload/load platform. 5) Move one tank from the boat harbor and set the tank level in the excavation. Set the buoyancy restraint anchors. Note: No personnel are to enter the excavation. Stake the anchor cables on the ground at the top of the hole. This sequence can be reversed with the buoyancy anchors set first if desired by the contractor. 6) Backfill with clean coarse grained sand to halfway up the side of the tank and pack it with the excavator bucket as it is placed. This material will be brought from the gravel pit. Care must be exercised to prevent damage to the tank wall. 7) When the excavation is filled halfway up the tank, the excavation should then be between two and four feet deep and safe for personnel to enter. Once it is determined that it's safe for personnel to enter the excavation, place the two inch wide steel strapping in the buoyancy restraint guides on the top half of the tank, unstake the anchor cables and fasten them to the straps with cable ties, and connect the cables from both sides of the tank on top with wire rope clips as shown in the section drawing. 8) Fill the excavation to the natural ground elevation with clean coarse or medium grained sand and pack it with the excavator bucket as it is placed. Cover the tank to a depth of one foot with material stock piled from clearing the roadway and tank site. Care must be exercised to prevent damage to the tank wall. 9) Repeat this sequence for the second tank.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

July 31, 2023

img_map_placeholder

Parker Rd, Gustavus, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.