BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kalama, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of November 2, 2023, a general contractor was awarded and construction is complete. *The closed solicitation has been included below for reference: This contract provides for the construction of new ADA compliant sidewalk along Cedar Street from 10th Street, west approximately 400 linear feet and along 10th Street from Cedar Street, south approximately 200 linear feet. It also includes sidewalk along 10th Street from Cedar Street, north approximately 320 linear feet, and along Date Street from 8th Street to 9th Street. Improvements include, but are not limited to, excavation, grading, cement concrete curb and gutter, cement concrete sidewalk, storm drainage improvements, minor asphalt paving, channelization, traffic control and other related work items. The Work shall be substantially complete within 45 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Kalama, Washington. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Kalama" and in an amount of not less than five percent (5%) of the total Proposal amount. Bidders are encouraged to register in order to receive automatic email notification of future addenda and to be placed on the Bidders List. For assistance, please call (206) 284 0860. Contract questions shall be directed only to the office of the Project Engineer. Financing of the Project has been provided by City of Kalama, Washington and the Washington State Transportation Improvement Board. The City of Kalama expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.

Occupancy

Sidewalks / Parking Lot

$404,372.00

Public - City

Paving, Site Work

33

6

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
28
Bidding Soon
580
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.