BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Corte Madera, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of May 17, 2023, the project has been awarded and construction is expected to commence May 23, 2023 with 50 working days to be completed. work as indicated in the construction plans: o Signs and traffic control, erosion and sediment control, and clearing and grubbing. o Polymer modified rubberized cape sealing, micro-surfacing, asphalt grinding, hot mix asphalt resurfacing, adjusting utility covers to grade. o Thermoplastic striping and pavement markings as well as curb paint. The general contractor is required to have a California State Contractor's License Class A. The Town reserves the right to reject any or all bids, or to accept only a portion of certain items of the bid or to waive informalities in the bid. A certified check, or bid bond executed by an admitted surety insurer, for not less than ten percent (10%) *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$1,359,359.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
166
Bidding Soon
3,252
All Active Projects
1,304
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2023

May 23, 2023

July 12, 2023

img_map_placeholder

Multiple Locations, Corte Madera, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.