Site work for a water / sewer project in Bargersville, Indiana. Completed plans call for site work for a water / sewer project.

The Proposal must be made on the forms provided in the Contract Documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, or an acceptable bidder's bond, in an amount not less than five percent (5%) of the total amount of the bid, payable to the Town of Bargersville, Indiana. The bidder to whom a contract for work is awarded will be required to furnish a Performance and Payment Bond executed on the specified forms and acceptable to the Town, in the amount of one hundred percent (100%) of the Contract. The bidder must supply all the information required by the bid proposal form. Partial payment will be made monthly based on an approved payment request. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, Non- segregated Facilities, and Affirmative Action requirements. The Town of Bargersville, Indiana, reserves the right to reject any and all proposals or parts there-of and to waive all responsibility for irregularities in bids. Bids may be held by the Town of Bargersville, Indiana for a period not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and the investigation of the qualifications of bidders, prior to the awarding of the Contract. The Project includes the installation of approximately 2,200 feet of 6"-12" water main in three separate areas within the Bargersville Water Service Area. The work includes excavation, pipe installation, disinfection, testing, connection to existing mains, maintenance of traffic, utility coordination, demolition, clearing and grubbing, erosion control, and all restoration to return the Project area to at or better than existing conditions. PROJECT START DATE: May 1, 2023 SUBSTAINTIAL COMPLETION DATES: C.R. 300 Pennington Rd. S.R. 135 June 1, 2023 July 1, 2023 August 1, 2023 FINAL COMPLETION DATE: September 1, 2023

Award

Water / Sewer

$210,470.00

Public - City

Site Work

13

8

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
74
Bidding Soon
698
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

June 1, 2023

img_map_placeholder

Multiple Locations, Bargersville, IN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.