Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 17, 2025 at 8:00 PM
Updated August 19, 2025
Site work and paving for a sidewalk / parking lot in Half Moon Bay, California. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Update:https://tinyurl.com/3nkck8e5 This project includes the design, permitting, environmental clearance, and construction of a Class I multi-use path parallel to the east side of Highway 1 between Roosevelt Boulevard and Mirada Road for approximately 0.27 miles. The project will extend the current Class I path from the existing terminus at Roosevelt Boulevard north to the City limits. The path will be approximately 8-foot wide and 2-foot shoulders on each side, including a 40-foot bridge. Project is included City of Half Moon Bay Fiscal Year 2025-2029 Page no 101 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Location: Bike Trail from Roosevelt to Mirada, east of Hwy 1 This project includes the design, permitting, environmental clearance, and construction of a Class I multiuse path parallel to the east side of Highway 1 between Roosevelt Boulevard and Mirada Road for approximately 0.27 miles. The project will extend the current Class I path from the existing terminus at Roosevelt Boulevard north to the City limits. The path will be approximately 10-foot wide and 2-foot shoulders on each side, including a 40-foot bridge. Project is included in the City of Half Moon Bay's Fiscal Year 2024-2028 Capital Improvement Program (CIP). Per the owner, as of September 12, 2024, a design team has been selected. The owner states that advertisement for construction is anticipated in the winter of 2024/2025 and construction is anticipated to begin in the spring of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Sidewalks / Parking Lot
$558,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
CA-1, Half Moon Bay, CA
Related To This Project
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Aug 08 2024
Half Moon Bay, CA
Bid Date: Aug 01 2024
Half Moon Bay, CA
Bid Date: Aug 14 2024
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Aug 13 2024
Half Moon Bay, CA
Bid Date: Aug 13 2024
Half Moon Bay, CA
Bid Date: Aug 30 2024
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
