BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a sidewalk / parking lot in Half Moon Bay, California. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Update:https://tinyurl.com/3nkck8e5 This project includes the design, permitting, environmental clearance, and construction of a Class I multi-use path parallel to the east side of Highway 1 between Roosevelt Boulevard and Mirada Road for approximately 0.27 miles. The project will extend the current Class I path from the existing terminus at Roosevelt Boulevard north to the City limits. The path will be approximately 8-foot wide and 2-foot shoulders on each side, including a 40-foot bridge. Project is included City of Half Moon Bay Fiscal Year 2025-2029 Page no 101 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Location: Bike Trail from Roosevelt to Mirada, east of Hwy 1 This project includes the design, permitting, environmental clearance, and construction of a Class I multiuse path parallel to the east side of Highway 1 between Roosevelt Boulevard and Mirada Road for approximately 0.27 miles. The project will extend the current Class I path from the existing terminus at Roosevelt Boulevard north to the City limits. The path will be approximately 10-foot wide and 2-foot shoulders on each side, including a 40-foot bridge. Project is included in the City of Half Moon Bay's Fiscal Year 2024-2028 Capital Improvement Program (CIP). Per the owner, as of September 12, 2024, a design team has been selected. The owner states that advertisement for construction is anticipated in the winter of 2024/2025 and construction is anticipated to begin in the spring of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Sidewalks / Parking Lot

$558,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
142
Bidding Soon
2,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

CA-1, Half Moon Bay, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.