BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a sidewalk / parking lot in Half Moon Bay, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Location: Spindrift Way to Ruisseau Francais Avenue This project includes the extension of a 10-foot wide bicycle/pedestrian (multi-purpose) Class I trail from Spindrift Way to Ruisseau Francais Avenue (1,600 feet). This project also includes a new bridge crossing over Frenchman's Creek and is an extension of the Highway 1 Safety projects. Project is included in the City of Half Moon Bay's Fiscal Year 2025-2029 Capital Improvement Program (CIP). As of September 4, 2025, a design team has not yet been named. The project is budgeted for the 2025-26 fiscal year. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$3,700,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
4
Bidding Soon
1,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Ruisseau Francais Ave, Half Moon Bay, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.