BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2023 at 8:00 PM

Updated March 22, 2024

Renovation of a bridge / tunnel in Boston, Massachusetts. Completed plans call for the renovation of a bridge / tunnel.

BCEC Fire protection Equipment Replacement - This project includes providing all labor, materials, and fire protection equipment at Boston Convention and Exhibition Center (BCEC), which shall include, but not be limited to, partial demolition of existing systems; installation of new components; and repair and refinishing of all disturbed areas to match existing., all as more fully set forth in the Specifications and Drawings. Questions or requests for information, clarification or interpretation of the bidding documents must be submitted to bflynn@massconvention.com in writing in accordance with the Instructions to Bidders and must be received no later than 4/19/23 @ 5:00 P.M.

Award

Bridges / Tunnels

$219,809.00

Public - State/Provincial

Renovation

36

25

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
7
Bidding Soon
2,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

Project location map

415 Summer Street, Boston, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.