Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 7, 2023 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Sherwood Park, Alberta. Contact the soliciting agency for additional information.
Strathcona County requires engineering consultants of various disciplines to provide engineering services for various matters related to the Utilities department, including but not limited to municipal water, wastewater, stormwater, recycled wastewater, and district energy systems. The design of stormwater systems for removal of surface water to prevent flooding. Urban areas have many impermeable surfaces which tend to concentrate water. The stormwater systems collect water via channels, culverts, pipes, drainage reserves, settling ponds. For the most part these are gravity fed systems. The stormwater outflows into rivers, lakes, tidal creeks, estuaries, coastal water and the ocean. The respondent must be a single legal entity that, if selected, intends to enter into the Master Framework Agreement described below in section 1.3. If the response is being submitted jointly by two (2) or more separate entities, the response must identify only one of those entities as the “respondent”. The respondent will be responsible for the performance of the Deliverables pursuant to any agreement awarded during the term of the Master Framework Agreement. To contact the County in relation to this RFSQ, respondents must initiate the communication electronically through the bidding system. The term of the Master Framework Agreement is to be for a period of 3 years Questions Due Date: Apr 25th 2023, 2:00 PM MDT The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2023
Multiple Locations, Sherwood Park, AB
Related To This Project
Sherwood Park, AB
Bid Date: May 02 2023
Sherwood Park, AB
Bid Date: Apr 27 2023
Sherwood Park, AB
--
Sherwood Park, AB
Bid Date: Apr 20 2023
Sherwood Park, AB
Bid Date: May 04 2023
Sherwood Park, AB
Bid Date: May 09 2023
Sherwood Park, AB
Bid Date: May 24 2023
Sherwood Park, AB
Bid Date: Apr 20 2023
Sherwood Park, AB
Bid Date: Apr 20 2023
Sherwood Park, AB
Bid Date: Apr 19 2023
Sherwood Park, AB
Bid Date: Apr 04 2023
Sherwood Park, AB
Bid Date: Apr 18 2023
Sherwood Park, AB
Bid Date: Apr 11 2023
Sherwood Park, AB
Bid Date: Apr 18 2023
Sherwood Park, AB
Bid Date: Apr 06 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed