BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Frisco, Texas. Completed plans call for site work for a road / highway; and for paving for a sidewalk / parking lot.

Road to Panther Creek Parkway, and 1,400 LF of bridge widening over Stewart Creek. Work includes but is not limited to grading, paving, sidewalks, drainage, bridge structure, pavement markings/signage, and traffic signal at various locations as shown in the Location maps. Paving work must be completed within 575 calendar days. Liquidated damages will be assessed after 630 calendar days if Contractor fails to meet this requirement. Questions Due Date: Oct 4th 2023, 5:00 PMC DT Location Project #14130 From Lebanon Rd to Eldorado Pkwy Project #18120 From Eldorado Pkwy to Panther Creek Pkwy Bidders must submit with their bids a cashier's check in the amount of five percent (5%) of the maximum amount bid. The OWNER reserves the right to reject any or all bids and to waive any irregularities or formalities. In case of ambiguity or lack of clearness in stating the price of the bids, the OWNER reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable or unbalanced unit prices will be considered sufficient cause of rejection of any bid or bids. Liquidated damages will be assessed after 630 calendar days if CONTRACTOR fails to meet this requirement Estimate of Probable Cost Range: $1,350,000 to $2,350,000 The project, Dallas Parkway Improvements Phase 4, generally includes the construction of approximately 17,000 SY of pavement widening along Dallas Parkway from Lebanon Road to Panther Creek Parkway, and 1,400 LF of bridge widening over Stewart Creek. Work includes but is not limited to grading, paving, sidewalks, drainage, bridge structure, pavement markings/signage, and traffic signal at various locations as shown in the Location Maps. Paving work must be complete within 575 calendar days. Liquidated damages will be assessed after 575 calendar days if CONTRACTOR fails to meet this requirement. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$11,890,802.00

Public - City

Paving, Site Work

297

31

83

3

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,515
All Active Projects
1,397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.