Site work and paving for a transportation facility in Des Moines, Iowa. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Accessibility for Individuals with Disabilities. The Des Moines Airport Authority is pleased to provide accommodations to individuals with disabilities or groups and encourages participation. To better serve you, please notify us at least three business days in advance when possible at 515-256-5100, should special accommodations be required.The Board may award a Contract at said meeting, or at such other time and place as shall then be announced. The Engineer's opinion of probable construction cost for the Work is between $5,800,000 and $6,400,000. The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.Commencement of Work. Work on the improvements shall be commenced any time after a written Notice to Proceed is issued and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur in May, 2023. Bid Security and Bonds. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract corporate Surety Performance and Payment Bond(s), in a form acceptable to the Board, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount of ten (10%) percent of the Bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board. The bid shall contain no condition except as provided in the specifications. Performance, Payment, and Maintenance Bonds. Each successful Bidder will be required to furnish corporate Surety Bonds in an amount equal to one hundred percent (100%) of its Contract price. Said Bonds shall be issued by a responsible Surety approved by the Des Moines Airport Authority and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the Des Moines Airport Authority from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. Award of Contract. All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Des Moines Airport Authority for a period not to exceed 30 days from the date of the bid opening for the purpose of conducting the bid evaluation. The Owner will base the award of contract upon the lowest aggregate sum proposal submitted from those bidders the Owner confirms as being responsive and responsible. The right is reserved, as the Des Moines Airport Authority may require, to reject any and all bids and to waive any informality in the bids received. Contract Documents. A copy of said plans, specifications, and form of contract, and estimated total cost is now on file in the office of the Director of Engineering and Planning and may be examined at the Des Moines International Airport, 2nd Floor, Room 207, 5800 Fleur, Drive, Des Moines, Iowa.Failure to submit a fully completed and accurate Bidder Status Form with the Proposal may result in the Proposal being deemed non-responsive and may result in the Proposal being rejected. Sales Tax. The bidder should not include sales tax in the bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Preference of Products and Labor. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Title VI Solicitation Notice. The Des Moines Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Completion of Work. This project shall be fully completed no later than November 3, 2023, except for Phase 5 which shall be completed within 45 Calendar Days after the owner supplied switchgear and transformer has been turned over *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work generally consists of: 1. Pavement removal 2. Class 10 Excavation 3. PCC Pavement 4. Pavement Markings 5. Silicone Joint Sealant 6. High Mast Lighting 7. Parking Lot Lighting 8. Airfield Lighting 9. Electrical and Communications 10. Chain Link Fencing 11. Storm Sewer Drainage 12. Traffic Control 13. Construction Survey 14. Seeding and Mulching 15. Landscaping All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail, email, or fax. Contact individual shall be as follows: Andrew S. Gettler, P.E. Foth Infrastructure & Environment, LLC 8191 Birchwood Ct., Suite L Johnston, Iowa 50131 515-251-2567 (Office) Andrew.Gettler@Foth.com Question Deadline 04/20/2023
Bid Results
Transportation Terminals
$8,257,900.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2023
June 26, 2023
5800 Fleur Dr, Des Moines, IA
Related To This Project
Des Moines, IA
Bid Date: May 09 2023
Des Moines, IA
Bid Date: Mar 13 2024
Des Moines, IA
Bid Date: May 02 2023
Des Moines, IA
Bid Date: Apr 18 2023
Des Moines, IA
Bid Date: Apr 19 2023
Des Moines, IA
Bid Date: Apr 20 2023
Des Moines, IA
Bid Date: Apr 06 2023
Des Moines, IA
Bid Date: Apr 26 2023
Des Moines, IA
Bid Date: Apr 18 2023
Des Moines, IA
Bid Date: Apr 25 2023
Des Moines, IA
Bid Date: Apr 19 2023
Des Moines, IA
Bid Date: Apr 28 2023
Des Moines, IA
Bid Date: Apr 25 2023
Des Moines, IA
Bid Date: May 09 2023
Des Moines, IA
Bid Date: Apr 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.