Renovation of an educational facility in Fairfield, California. Completed plans call for the renovation of a 20,974-square-foot, one-story above grade educational facility.

SLDBE Participation goal of 20% of the total construction contract amount The Project consists of a. All labor, materials, equipment, and supplies necessary for the completion of the entire scope of work as outlined in the contract documents. Includes all associated civil, architectural, structural, plumbing, mechanical, electrical and/or low voltage work as indicated in the Drawings and Specifications. b. The scope of work includes, but is not limited to; HVAC upgrades to the controls and valves as well as motors and components without the removal of the existing equipment. Removal and replacement of the existing roofing, removal and replacement of the existing ceiling tiles, restroom upgrades, ADA upgrades on the path of travel. c. Scope includes painting of all interior spaces. d. Scope of work includes a complete remodel of Room 303. Room will be converted into an Adjunct Faculty Space. e. Contractor shall include safe-off of all utilities, including but not limited to all electrical, fire alarm, data, security, and plumbing as needed to complete the project scope. f. The scope of this project is further defined in the Contract Documents. The Contractor will provide all security fencing, safety barriers, portable toilets, and debris bins per the Contract Specifications. Multiple relocations of site fencing/ safety barriers may be required for the completion of this project. All campus pedestrian access shall be maintained, and existing buildings shall remain functional during the duration of the project. The Governing Board of the Solano Community College District("District") is inviting sealed bids for the Fairfield Campus Building 300 Modernization Technical questions must be submitted, in writing by no later than 2:00 p.m. on, Wednesday, April12th, 2023 to Noe Ramos via email at Noe.Ramos@Solano.edu. All bids received will require acknowledgement of receipt of any issued addenda to be considered responsive and responsible.

Award

Educational

$1,861,132.00

Public - County

Renovation

52

29

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
90
Bidding Soon
1,866
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

June 24, 2024

img_map_placeholder

4000 Suisun Valley Rd, Fairfield, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.