BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Lombard, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Site Directions: The proposed work is officially known as FY 2023 Concrete Rehabilitation and will include Class B Patching located throughout the Village of Lombard. Residential roadways with more substantial panel work include the following locations; Wilson Avenue from Edson Street to Main Street, Grace Street from Wilson Avenue to Madison Street, Highland Avenue from St. Charles Road to Division Street, and Lombard Avenue from Morningside Avenue to the dead to end to the south. Project Category Code: Street/Road Concrete Reconstruction, Street/Road/Bypass Lane Construction and/or Repair, Street/Road Repairs, Street/Road Intersection Construction and Repair, Street/Road Concrete Repair, Street/Road Lane Construction and Repair, Street/Roadway Reconstruction , Concrete Pavement, Concrete Pavement Removal, Traffic Control, Sidewalks/Curbs/Gutters, Traffic Control/Flagging, Concrete Repair. Description: The proposed work is officially known as FY 2023 Concrete Rehabilitation and will include Class B Patching located throughout the Village of Lombard (approximate locations can be seen on the map in appendix 1 of this document. Please note that the locations are subject to change and may be added or subtracted as warranted by the Village). Overall the project consists of the construction of approximately 8,500 SY of 8" Class B Patching type IV (roughly half of the panels include monolithic curb which replacement will be considered incidental to the Class B Patching contract item), approximately 120 SY of 10" Class B Patching type IV, approximately, 400 Foot of B.6.12 and 30 Foot of B6.24 curb and gutter removal and replacement, approximately 1,000 Sq. Ft. of 5 PCC sidewalk removal and replacement, 200 Sq. Ft. of detectible warnings as well as other incidental items needed to complete the project. Residential roadways with more substantial panel work include the following locations; Wilson Avenue from Edson Street to Main Street, Grace Street from Wilson Avenue to Madison Street, Highland Avenue from St. Charles Road to Division Street, and Lombard Avenue from Morningside Avenue to the dead to end to the south (approximately 4000 SY, 1000 SY, 2000 SY, and 550 SY of panels, respectively). Based on the level of patching and traffic volumes, it is anticipated that several areas may require increased traffic control including: Wilson Avenue from Main Street to Edson Street, and Grace Street from Wilson Avenue to Madison Street. One-way westbound traffic is anticipated to be implemented from Main Street to Edson Avenue along Wilson Avenue, the additional traffic control effort will be considered incidental to Traffic Control & Protection. A traffic control-signing plan must be submitted to the Village for review of all required signage and traffic control devices which must meet all applicable MUTCD and IDOT Specifications to implement the staging for westbound Wilson Avenue. The Village will allow the use of Graham Avenue from Main Street to Edson Avenue as a detour for Wilson Avenue during this construction staging. A conceptional "FOR BID PURPOSE ONLY" plan has been included in the appendix 1 for reference. Note patching and restoration near school locations will need to be finished prior to August 4th, before the first day of school. All of the above as well as other project details are further described in the contract documents for the said work prepared by the Village of Lombard. Additional Description: Pre-qualification of Bidders in accordance with Section 102 of the Standard Specifications for Road and Bridge Construction in Illinois will be required of all Bidders on this proposal. Bidders must submit IDOT pre-qualification documentation by 5:00pm on April 14, 2023. Questions shall be submitted to Brendan Huizinga at huizingab@villageoflombard.org. Est. Value Notes: 860529.80 - 1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$793,421.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
115
Bidding Soon
1,755
All Active Projects
772
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2023

June 20, 2023

img_map_placeholder

Multiple Locations, Lombard, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.