BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2023 at 8:00 PM

Updated September 17, 2025

Demolition, site work and new construction of a bridge / tunnel in Defuniak Springs, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

The project consists of constructing a new 68-foot concrete two-span vehicular bridge on concrete pilings on County Road 83A. The project also includes demolition of the existing double concrete box culvert on County Road 83A along with earthwork activities and rip-rap to stabilize the slopes under the proposed bridge. All questions are to be directed in writing to waljames@co.walton.fl.us. Directing Questions to Any Other Staff, Project Engineer and Any Other Person is Prohibited and Will Result in Bid Being Disqualified. Questions received after such date and time will not be answered. To be considered, Bidder must submit bid digitally on a USB THUMB DRIVE, along with ONE ORIGINAL PAPER BID, in a sealed envelope clearly marked "ITB 23-16 CR 83A Bear Creek Bridge" addressed to Bids: Central Purchasing at 176 Montgomery Circle, DeFuniak Springs, FL 32435. Bidder is responsible for the delivery of its bid. Bids received after the specified day and time will not be opened.

Award

Bridges / Tunnels

$991,637.00

Public - County

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
30
Bidding Soon
792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

July 3, 2023

Project location map

Creek, Defuniak Springs, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.