BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Cold Spring, Kentucky. Completed plans call for site work for a playground / park / athletic field.

**As of May 19, 2023 this project has been awarded to Riegler Blacktop with bid amount of $252,747.50.** **As of April 24, 2023 this project has not yet been awarded. A timeline for award has not yet been established.** For furnishing all labor, materials, and equipment necessary to complete the project known. This project shall include all work necessary to construct new asphalt pickleball courts including all associated coatings, striping, netting, fencing, etc. as well as all site work and storm sewer. The bidder to whom the contract is awarded will be required to furnish a surety bond in an amount equal to one hundred percent (100%) of the contract amount. The successful bidder will be required to have a current occupational license in the City of Cold Spring before the Contract will be awarded. Proposals must contain the full name of the party or parties submitting the same and all persons interested therein. Questions received less than five (5) days prior to bid date cannot be answered The Contractor shall do all the work and furnish all the materials, except as herein otherwise specified, necessary or proper for performing and completing the work of the Contract. The methods, materials, and appliances used, therefore, must be such as will produce the quality of work specified and ensure safety to the public and property. Access to abutting properties shall be maintained at all times except for temporary periods as herein stated. In the event the Contractor will be temporarily blocking the access to any property during some period of construction, he must notify all residential or business occupants at least 24 hours before said blockage to allow them time to move any vehicles in or out. No blocking of traffic will be allowed during the peak traffic hours of 6:30 - 8:30 AM and 4:30 - 6:30 PM. The contractor may temporarily block traffic for placement and/or removal of materials (i.e. concrete trucks, stone trucks, dump trucks, etc.). The length of closure should only be the time it takes to empty or load a truck and not exceed 15 minutes. All stacked traffic must be allowed to clear the roadway after each 15-minute period of closure before another period of closure is permitted. Construction work shall take place between the hours of 7:00 A.M. to 7:00 P.M., Monday through Saturday.

Award

Playgrounds / Parks / Athletic Fields

$252,748.00

Public - City

Site Work

9

8

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
13
Bidding Soon
1,288
All Active Projects
501
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 22, 2023

img_map_placeholder

5694 E Alexandria Pike, Cold Spring, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.