BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Wilton, New Hampshire. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Administrative Inquiries: Nick Germain, Town Administrator Wiltonta@wiltonnh.gov - 603-654-3299 Technical Inquiries: Mike Tatro, Public Works Director highway@wiltonnh.gov - (603) 654-6602 Anticipated Award Timeframe: Within 20 days of proposal deadline Anticipated Contract Signing: Within 60 days of deadline Inquiry Addresses: Street Address Administration Office Wilton Town Hall 42 Main Street Wilton, NH 03086 Mailing Address Wilton Town Hall Town Administrators Office P.O. Box 83 Wilton NH, 03086 The Town of Wilton is utilizing a sealed bid process in compliance with its purchasing policy. Given that the town has generally identified the type of work needed, a simple request for bids process is being utilized. Desired Outcome: The town secures anticipated quality reclamation and fine grade work The town has guarantees for an appropriate warranty period Reclamation and Fine Grade of the following roads. All reclamation will be full depth and compacted with water truck. All fine grade will be no less than 2 degrees and no more than 4 degrees pitch on both sides of center line. Road Estimated Footage Tremont street 55'x24 East Intervale Road 830x21 West Intervale Road 1,360x22 Draper Road 350x21 All over burden during Fine Grading is to be removed by the Wilton DPW. Any Gravel needed during Fine Grading to be supply by Wilton DPW Pave 3/4 Winter Dense Binder The Following Roads to have 3/4 winter dense binder at 2inch compacted Road Estimated Footage Tremont Street 550x24 East Intervale Road 830x21 West Intervale Road 1,360x22 Draper Road 350x21 Hillside Road 1,210x18 Pave 1/2 Inch Overlay The following roads are to have 1/2 Top at 1.5 inches compacted All cold joints to be milled Road Estimated Footage Issac frye highway from Forest Road to Burton Highway 2,640x21 Burns Hill Road From Island Street / Forest Road Intersection 4,224x24 The Select Board of the Town of Wilton reserves the right to reject all or any part of any or all proposals, to waive technical or legal deficiencies, and to accept any proposal that it deems to be in the best interest of the Town of Wilton.

Bid Results

Roads / Highways

$255,363.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
518
Active Projects
209
Bidding Soon
4,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

June 26, 2023

Project location map

Multiple Locations, Wilton, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.