BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction of Water and Sewer Group 965 consists of the installation of sixteen-inch (16") water mains, twelve-inch (12") water mains, water services, fire hydrants, eight-inch (8"), ten-inch (10") and twelve-inch (12") sewer mains, sewer manholes, sewer laterals, replacement and upgrading of a pressure reducing station, and all other work and appurtenances. Additive alternate scope of work are the following: 493.99 feet (0.09 miles) of 8' PVC sewer mains, two sewer manholes, and corresponding sewer laterals, 486.30 feet (0.09 miles) of 12' PVC water mains and corresponding water services, asphalt cement for the overlay for streets, the signing, striping, and electrical improvements. Liquidated Damages $1200 per day

Bid Results

Sidewalks / Parking Lot

$7,610,182.00

Public - City

Paving, Site Work

92

15

5

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
89
Bidding Soon
1,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

June 5, 2023

Project location map

To Be Determined, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.