EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Niles, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Prevailing wages as determined by the federal Davis Bacon Act shall apply. All bidders are required to sign a certification that they will comply with all Federal and State nondiscrimination laws and regulations. 1 Curb Remove, Modified 255 LFT 2 Machine Grading, Modified 295 SYD 3 Subgrade Undercut, Type II, CIP 65 CYD 4 Dr Structure, Modified 1 EA 5 Curb, Conc, Detail E2 Modified 242 LFT 6 Cold Milling, 1-1/2" 700 SYD 7 Pavm't, Conc 8", Modified 2,500 SFT 8 HMA, 36A, 165#/SYD 65 TON 9 Pavmt Marking (Match Existg) 1 LS 10 Contractor Staking 1 LS The successful bidder will be required to furnish satisfactory 100% performance bond as well as labor and material bond and a 100% maintenance bond (for 1 year). A certified check or bidders bond in an amount of not less than five percent (5%) of the amount of the bid will be required with each bid. Bids submitted without the certified check or bidders bond will not be accepted. The City reserves the right to reject any or all bids, to waive irregularities in bids and to accept the bid that in the opinion of the City Council is most advantageous to the City. No bid shall be withdrawn after the opening of bids for a period of ninety (90) days after the scheduled time of receiving bids. The contractor shall commence work under this contract as soon as possible and shall fully complete all work under this contract by Friday, September 29 Once work th , 2023. commences, all work shall be completed within 60 calendar days.

Post-Bid

Roads / Highways

$450,000.00

Public - City

Paving, Site Work

3

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
52
Bidding Soon
1,232
All Active Projects
515
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

June 1, 2023

img_map_placeholder

Multiple Locations, Niles, MI

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Niles Dart 2023 Site Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.