Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Kapolei, Hawaii. Completed plans call for the renovation of a transportation facility.
As of November 2024, an awarded design builder has been identified. Construction is not anticipated to begin prior to the second quarter of 2025. The Honolulu Authority for Rapid Transportation (HART) is pleased to present this Request for Proposals (RFP) Part 1 to prospective entities or groups of entities (Offerors) interested in submitting Part 1 Proposals to design and construct the City Center Guideway and Stations (CCGS) under a Design-Build Contract (Project). HART is using the design-build project delivery methodology to work in a collaborative manner, reduce cost, and expedite completion of the Project. 2.0 Project Description The Honolulu Rail Transit Project (HRTP) is an approximate 18.75-mile grade-separate, automated fixed rail system from East Kapolei in the west to the Civic Center Station, located east of downtown Honolulu, in the east. The HRTP includes 19 stations, 80 light-metro fully automated (driverless) rail vehicles, a maintenance and storage facility (MSF) on a 44-acre parcel near Leeward Community College, and three park-and-ride facilities. The mission of the HRTP is to provide fast, reliable public transportation services in rapidly developing areas with diverse populations. This Project is the third segment and fourth guideway section for the Honolulu Rail Transit Project (HRTP). The Project’s base scope includes approximately three miles of elevated guideway supported by drilled shaft foundations and consisting of standard and eccentric piers, in addition to straddle bents. Beginning from the end of the Airport segment, the alignment remains in the center median of Kamehameha Highway, just Diamond Head of the Middle Street Transit Center Station. While the roadway name changes from Kamehameha Highway to Dillingham Boulevard, the alignment remains in the center median of the roadway until it reaches Waiakamilo Road, where it transitions to the mauka side of Dillingham Boulevard until it reaches Ka’aahi Street. Traveling beyond Ka’aahi Street the alignment crosses over Iwilei Road and onto Nimitz Highway. Traveling along the center median of Nimitz Highway, the alignment passes over Nu’uanu Stream and into the Chinatown and City Center district of Honolulu. Just Diamond Head of Alakea Street, the alignment turns off Nimitz Highway to the makai side of the Halekauwila Street. Between South Street and Keawe Street, the Halekauwila alignment transitions from the makai side to the center of the roadway, utilizing straddle bents allowing vehicular traffic underneath to travel safely through this corridor. 3.0 Procurement Schedule Schedule reflects in correspondence with the Solicitation’s RFP package. The base scope includes construction of six stations, including systems installation similar to the existing 13stations. The six stations include: Kalihi Station, Kapalama Station, Iwilei Station, Chinatown Station, Downtown Station, and Civic Center Station. The alignment traverses and will require Work in and around Kapalama Stream and Nuuanu Stream. The project includes portions of private properties acquired by HART, as well as City and County of Honolulu-owned and State of Hawaii-owned properties.
Award
Transportation Terminals
$1,659,750,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2023
May 5, 2025
Multiple Locations, Kapolei, HI
Related To This Project
Kapolei, HI
--
Kapolei, HI
Bid Date: May 06 2021
Kapolei, HI
Bid Date: Jun 15 2020
Kapolei, HI
Bid Date: May 14 2020
Kapolei, HI
--
Kapolei, HI
Bid Date: Oct 13 2023
Kapolei, HI
Bid Date: Mar 09 2022
Kapolei, HI
Bid Date: Feb 28 2019
Kapolei, HI
Bid Date: Feb 26 2020
Kapolei, HI
Bid Date: Apr 18 2023
Kapolei, HI
Bid Date: Apr 23 2020
Kapolei, HI
Bid Date: Oct 25 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.