EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Mount Pleasant, Wisconsin. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Owner Number: 1220603 / 2440.00 Project Category Code: ADA Curb Ramps, Sanitary Sewer (Gravity), Water Utilities, Pavement - Marking, Street/Road Turn Lane Improvements, Sidewalks/Curbs/Gutters, Sawcutting/Sidewalk/Pavement, Traffic Control, Fire Hydrant, Grade and Surface, Landscaping, Street/Road Materials, Landscaping - Seeding, Erosion Control - Temporary, Paving (Asphalt or Concrete), Street/Road Intersection Improvements, Storm Drain and Paving, Street/Road Pavement Marking, Sewer and Water Construction, Sitework/Excavating and Grading, Curbs, Waterlines, Paving (Highway, Road or Street) All questions about the meaning or intent of the Contract Documents shall be submitted to the Aaron Koch at Pinnacle Engineering Group (aekoch@pinnacle-engr.com). Additional Description: Construction of Public Improvements to Via Vita includes: grading, storm and sanitary sewer construction, water main extension, curb and gutter, concrete sidewalk, signing and pavement marking, asphaltic pavement, traffic control and erosion control. Major work items quantities include: 435 tons of asphaltic pavement, 1,315 linear feet of curb and gutter, 650 tons of Base Aggregate Dense, 575 linear feet of varied sized storm sewer pipe, 785 linear feet of varied sized water main pipe and 1,520 linear feet of varied sized sanitary sewer pipe. \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ Project is to be substantially complete on, or before, June 30, 2024. \ o All Utilities, Binder Course and Curb and Gutter to be completed on or before October 31, 2023. o Surface Course to be completed no earlier than May 1, 2024 o Sidewalk, Lighting and Landscape to be completed on or before June 30, 2024. \ The Contract letting shall be subject to the provisions of Sections 61.54 and 66.0901 of the Wisconsin Statutes. \ All bidders must file a "Bidders Qualification Statement" with the Owner on or before seven days prior to the bid opening date. \ All bidders, and sub-contractors, must file a "3-Year Contractor's Qualification Application," and other documents with the Bid (see Instructions to Bidders). NOTE: ALL applications that were previously approved under the last 3-year cycle expired on 1-31-22. Therefore, ALL bidders and subcontractors that did NOT submit an application form for bidding on a project after the above date, MUST submit a new application form and $75.00 application fee in order to be considered for this project. All completed 3-Year Contractor's Qualification Applications should be submitted directly to the Village of Mount Pleasant All blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 45 days from the date of the bid opening. Failure to list subcontractors or suppliers may be cause for rejection of the Bid. \ Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of five (5) percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 15 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. \ The Owner has the right to reject any and/or all bids received, to waive any minor defects or irregularities that may be found in the bids, and to accept the bid that is in the best interest of the Owner, subject to the provisions of Sections 62.15 and 66.0901 of the Wisconsin Statutes. \ Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price. Prime Contractor(s) shall furnish listing of all subcontractors and suppliers performing labor and supplying materials under the Contract that individually have a total value of $1,000 or more.

Bid Results

Sidewalks / Parking Lot

$716,642.00

Public - City

Paving, Site Work

31

9

2

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Structure Moving
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
105
Bidding Soon
2,025
All Active Projects
816
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

img_map_placeholder

7130 Spring St, Mount Pleasant, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.