BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2023 at 8:00 PM

Updated January 29, 2024

Site work and new construction of a municipal facility in Poplar, Montana. Completed plans call for the construction of a 3,600-square-foot municipal facility; and for site work for a municipal facility.

The budget for base bid is about $700,000 and Phase B alternate 1 is $175,000 For the construction, delivery and placement of a new modular office building. This project is the procurement and placement of a new modular office building to house three departments of the Fort Peck Tribal Courts. A new 3,600 square foot (60'x60') Modular building as described in this document will be procured, delivered to the site in Poplar, Montana and will be set up on a concrete foundation system that will be constructed by others outside of this contract. All utilities and utility hook-ups to the new modular facility will be conducted by others under a separate contract. Alternate One: This alternate will identify the cost to procure and place a 900 square foot (15'x60') additional section on the north end of the new modular facility provided in the base bid. The addition as described in this document will be procured, delivered to the site in Poplar, Montana and will be set up on a concrete foundation system that will be constructed by others outside of this contract. All utilities and utility hook-ups to the added modular facility will be conducted by others under a separate contract. It is anticipated that funding for Alternate Number 1 may be delayed beyond the completion schedule for the base bid project and therefore will require that this addition will be a separate addition, delivered and added to an existing facility.

Post-Bid

Municipal

$700,000.00

Public - Federal

New Construction, Site Work

4

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
34
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

Project location map

Multiple Locations, Poplar, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.