Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Norman, Oklahoma. Completed plans call for the renovation of a municipal facility.
CAP-000754 ODMHSAS Replace Doors and Door Frames Norman, OK. Bond Percentage : 5.00% Cashier's Check, Certified Check, Irrevocable Letter of Credit. To complete this work within 120 days from the date of receipt of the Notice to Proceed/WORK ORDER. Cost Estimate: $135,000.00 The project will encompass the replacement of multiple doors and door frames at Central Oklahoma Community Mental Health Center, Oklahoma Children's Recovery Center and Griffin Memorial Hospital. A mandatory pre-bid meeting will be conducted, and contractors will take their own measurements of existing doors, door frames and door windows to ensure accurate replacements. The project consists of replacing twenty-three doors (23) doors, seventeen (17) door frames and two (2) panic devices. The project shall be turnkey. All doors must meet the required fire rating and adjustments shall be made for the proper and safe operation of all installed doors. As inpatient facilities, on-site work at Oklahoma Children's Recovery Center and Griffin Memorial Hospital must be conducted in a manner to ensure the safety of consumers, staff and contractors. All doors, door frames and door hardware must be ligature resistant, all fasteners used must be tamper resistant and all doors must be keyed on both sides. In addition, all drywall repairs and painting required due to project installations will be completed by the contractor. Clean-up of all jobsites must be thorough and complete. All debris created by the project will be disposed of by the contractor. The materials used and the additional services required must meet the specifications listed in the following scope of work for each facility . Locations- .Central Oklahoma Community Mental Health Center (South Building): 1120 East Main Street, Norman, OK 73071 Griffin Memorial Hospital: 900 East Main Street, Norman, OK 73071 Oklahoma Children's Recovery Center - 320 12th Ave NE, Norman, OK 73071
Award
Municipal
$161,424.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2023
June 9, 2023
Multiple Locations, Norman, OK
Related To This Project
Norman, OK
--
Norman, OK
Bid Date: Apr 27 2023
Norman, OK
Bid Date: Jun 13 2024
Norman, OK
Bid Date: Sep 24 2021
Norman, OK
Bid Date: May 11 2023
Norman, OK
Bid Date: May 19 2023
Norman, OK
Bid Date: May 18 2023
Norman, OK
Bid Date: Mar 28 2024
Norman, OK
Bid Date: Apr 18 2023
Norman, OK
Bid Date: Feb 14 2019
Norman, OK
Bid Date: Jun 27 2019
Norman, OK
Bid Date: Apr 06 2023
Norman, OK
--
Norman, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.