BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Norman, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of July 21, 2023, project was awarded to ARROYO’S CONCRETE LLC, awarded amount is $408,102.50 The project consists of removing select, existing, overlaid curb and gutter and a narrow strip of asphalt pavement, constructing new curb and gutter, and restoring the asphalt pavement. The project also includes driveway approach removal and replacement, miscellaneous sidewalk and ramp replacement, and minor storm structure repairs. The project location is Miller Avenue between Alameda Street and Classen Boulevard in Norman, OK Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions. For electronic copies of the specifications, information concerning the proposed work, or the scheduled Pre-bid Conference, contact Jeff Fordice, P.E., Capital Projects Engineer for OWNER, at jeff.fordice@n Questions related to this contract will be answered up to 4:00 p.m. on Monday, May 15 th 2023.

Award

Sidewalks / Parking Lot

$408,103.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
50
Bidding Soon
450
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

June 19, 2023

img_map_placeholder

Miller Ave, Norman, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.