BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Edwardsville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of May 3, 2023, this project has been awarded to DMS Contracting, Inc. in the amount of $1,027,793.50. The City of Edwardsville reserves the right to waive technicalities and to reject any or all proposals. Bituminous material cost adjustments will be made to provide additional compensation to the Contractor, or credit to the project owner, for fluctuations in the cost of bituminous materials when optioned by the Contractor. The bidder shall indicate on the attached form whether or not this special provision will be part of the contract and submit the completed form with his/her bid. Failure to submit the form, or failure to fill out the form completely, shall make this contract exempt of bituminous materials cost adjustments. Prequalification by the Illinois Department of Transportation is required. This work consists of driveway and parking pavements, on-grade slabs, walks, curbs, retaining walls, foundations, brush, debris, related items, and utilities at the location shown in the plans. Perform demolition in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 15 feet of fire hydrants. The proposed Hillsboro Avenue project includes roadway and drainage improvements from Hickory Street at the west end to Bunn Avenue at the east end. Improvements will include demolition of structures, channel excavation, flume and riprap installation, storm sewer removal and replacement, sanitary sewer removal and replacement, curb and gutter removal and replacement, driveway removal and replacement, and ADA sidewalk improvements

Award

Water / Sewer

$1,027,794.00

Public - City

Paving, Site Work

44

6

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
97
Bidding Soon
1,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2023

June 23, 2023

Project location map

Hillsboro Ave, Edwardsville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.