BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2024 at 7:00 PM

Updated March 7, 2024

Site work and paving for a road / highway in Camas, Washington. Design plans call for site work for a road / highway; and for paving for a road / highway.

Per the owner, as of March 6, 2024, a design team has been selected. The owner states that no timeline has been set for bidding or construction. Closed solicitation has been included below for reference. ........ This project will implement current MUTCD standards for signing and other safety countermeasures at approximately forty horizontal curves on arterial and major collectors within the City limits. Primary objectives for this project are as follows: 1) Conduct a horizontal curve inventory study and posted speed study to assess existing conditions: · Collect advisory speed data for each curve and turn using a Ball Bank Indicator. ·Collect operating speeds adjacent to each curve and turn, then analyze that data using current methodologies to determine the most appropriate posted speed limit. · Calculate the difference between advisory speed and posted speed limit per MUTCD guidelines. · Determine which curve locations require new or revised safety countermeasures as described in the City Safety Plan. · Document curves that meet current MUTCD standards and do not need additional safety countermeasures. 2) Design Safety Countermeasures: · Determine the regulatory and warning signs required at each curve per MUTCD standards. · Confirm sign placement feasibility via field review. Identify other potential safety countermeasures. · Evaluate whether proposed work will be located within private property and perform Right-of-Way tasks defined below, if necessary. · Develop PS&E package for implementation of safety countermeasures at determined locations 3) Construction Support: · Review contractor product submittals for conformance with contract documents. · Respond to Requests for Information from the contractor and revise construction documents as needed. · Inspect safety countermeasure installations for compliance with contract documents. Project Funding: Federal Funds have been secured for Preliminary Engineering, Right-of-Way (if applicable), and Construction.

Design

Roads / Highways

$360,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
49
Bidding Soon
1,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

March 6, 2025

Project location map

Multiple Locations, Camas, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.