EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a parking garage in Boulder, Colorado. Completed plans call for site work for a parking garage.

Fixed limit of design and construction is $44,000,000.00 for UCB000795 Main Campus #2 (MC2) Fixed limit of design and construction is $42,000,000.00 for UCB000796 North Boulder Creek #1 (NBC1) One garage shall be completed by July 1, 2025, and the second garage shall be completed by July 1, 2026. Respondent initiated requests for clarification will be received any time shall be sent via email to Joshua.porosky@colorado.edu; monika.magenheim@colorado.edu; and amy.kirtland@colorado.edu. May 1, 2023 at 5:00pm

Post-Bid

Parking Garage

$86,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution
Division 08 - Openings

Division 08 - Openings

Glazing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
50
Bidding Soon
868
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2023

September 15, 2023

img_map_placeholder

Multiple Locations, Boulder, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.