BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Chapel Hill, North Carolina. Completed plans call for the renovation of a military facility.

COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS General Information Document Type: Combined Solicitation/Synopsis Solicitation Number: 68HERC23R0123 Posted Date: 04/18/2023 Original Response Date: 05/09/2023 Current Response Date: 05/08/2023 Classification Code: http://www.SAM.gov Set Aside: Small Business NAICS Code: 333415 Contracting Office Address Cincinnati Acquisition Division 26 Martin Luther King Dr W Cincinnati, OH 45220 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, "Streamlined Procedures for Evaluation and Solicitation for Commercial Items," as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued. This solicitation is a request for quotations (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-01. The associated North American Industrial Classification System (NAICS) code for this procurement is 33415, with a small business size standard of 1,250 employees. The Cincinnati Acquisition Division, 26 Martin Luther King Dr W Cincinnati, OH 45220 is seeking to purchase a Cold Room Retrofit and Refurbishment. This requirement is to retrofit and replace all major conditioner system components, evaporator cooler system components, temperature and instrumentation control components, and chamber lighting components. This retrofit shall, at minimum, restore the environment chamber to original design performance. All interested companies shall provide quotation(s) for the following: Services I. Background: The environmental chamber (HSF 301) at the Human Studies Facility (UNC-CH) was constructed in 1995. The chamber has been through minor and major repairs throughout the years and is now deemed unreliable. This requirement is to retrofit and replace all major conditioner system components, evaporator cooler system components, temperature and instrumentation control components, and chamber lighting components. This retrofit shall, at minimum, restore the environment chamber to original design performance. II. Scope/Objective: The Contractor shall provide all personnel, labor, equipment, parts, tools, materials, vehicles, transportation, supervision, and services necessary to complete the work as described. It is the supplier's responsibility to ensure that all work meets applicable federal safety standards, OSHA requirements, state, county, and federal environmental regulations, including proper disposal of removal materials. III. Scope of Work: The Contractor is responsible for providing labor, material, and equipment required to complete the Scope of Work attached to this announcement: IV. Attachments: Attachment A: Original Chamber Purpose Attachment B: Statement of Work V. General Requirements, Facility Accessibility, and Safety Requirements: EPA's normal business hours are 8:00 a.m. - 4:30 p.m. Monday through Friday excluding Federal holidays. All work shall be performed during the normal business hours unless prior approval is received from the COR. A complete list of personnel to access the site shall be provided for approval, listing personnel to the COR including all the dates that individuals will be accessing the Edison Campus. Personnel accessing the site require security approval and shall comply with the EPA Security Requirements. All visitors shall have Government issued photo ID when accessing the facility. The Contractor shall comply with EPA Covid-19 Policies. The information regarding Covid-19 policies will be provided to the Contractor. Initial Safety briefing and discussion of the construction schedule be coordinated with the COR, and EPA Facilities Manager. The Contractor shall have a safety briefing with the onsite Facility/Safety Manager prior to commencement or work. VI. Acceptance Criteria: The Contractor shall comply with the requirements set forth in this Purchase Order. The COR may use various means to review the work and determine if it is acceptable to the Government. The Government will accept the work only after it fully meets all the requirements. Any requested changes or substitutions in products, materials, equipment, and/or methods from those required by the contract Documents proposed by the Contractor shall be submitted to the Contracting Officer and COR in writing. Any government revisions to the contract Documents will be requested by the government via a change order or contract modification request. VII. Milestone and Deliverables: Submit applicable documents to the COR for review and approval. Warranty certificates shall be submitted 5 days after the construction work is completed. VIII. Period of Performance: All work shall be completed within 60 days after the award. Place of Performance Address: 104 Mason Farm Road, Chapel Hill, NC Postal Code: 27514 Country: UNITED STATES Award shall be made to the offeror whose proposal, offers the Lowest Price Technically Acceptable, considering technical capability, past performance, and price. The government will evaluate information based on the following evaluation criteria: 1. The Contractor shall have a minimum of 5-year history of providing environment walk-in chambers of similar size and temperature range. 2. The Contractor shall be Licensed in the State of North Carolina for any specialties, such as electrician, necessary to complete the work. 3. Past Performance and Customer Satisfaction: The contractor shall submit a minimum of 3 references with facility name, point of contact, location, and chamber details. 4. The Contractor shall submit a plan of how they shall minimize interruptions to the operations of the Human Studies Facility during the retrofit process. 5. Cost The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: o FAR 52.212-1, "Instructions to Offerors-Commercial Items" [insert date of provision] o FAR 52.212-3, "Offerors Representations and Certifications-Commercial Items" [insert date of provision] Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3, "Offerors Representations and Certifications-Commercial Items." If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: o FAR 52.212-4, "Contract Terms and Conditions-Commercial Items o FAR 52.212-5, "Contract Terms and Conditions Required to Implement Statutes or Executive Orders All offerors shall submit the following: One Copy of requested information for quotation 1. The Contractor shall have a minimum of 5-year history of providing environment walk-in chambers of similar size and temperature range. 2. The Contractor shall be Licensed in the State of North Carolina for any specialties, such as electrician, necessary to complete the work. 3. Past Performance and Customer Satisfaction: The contractor shall submit a minimum of 3 references with facility name, point of contact, location, and chamber details. 4. The Contractor shall submit a plan of how they shall minimize interruptions to the operations of the Human Studies Facility during the retrofit process. 5. Price EPA will utilize the FedConnect(R) web portal in administering this contract. The contractor must be registered in FedConnect(R) and have access to the FedConnect website located . For assistance in registering or for other FedConnect technical questions please call the FedConnect(R) Help Desk at (800) 899-6665 or email at fcsupport@unisonglobal.com. The following contract clauses apply to this acquisition: o FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) o FAR 52.212-4, Contract Terms and Conditions-Commercial Items (OCT 2018) o FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders (JAN 2021) The following subparagraphs of FAR 52.212-5 are applicable: Subparagraphs (b)(22)(i), (b)(27), (b)(28), (b)(29), (b)(30)(i), (b)(35)(i),(b)(36) (b)(44), (b)(48), (b)(51), (b)(58) o Local Clauses EPA-H-42-102, Utilization of FedConnect for Contract Administration All responsible offers shall be sent electronically, reference the solicitation number #68HERC23R0123 to Megan Wallace, Contracting Officer, EPA Cincinnati Acquisition Division, 26 Martin Luther King Dr W, Cincinnati, OH 45220 Wallace.megan@epa.gov. This opportunity is set aside for small business concerns. The combined synopsis/solicitation for equipment as defined herein. The government intends to award a contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, ALL quotes shall include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Offeror shall list exception(s) and rationale for the exception(s). Submission shall be received not later than May 9, 2023, at 2:30 PM EST to Wallace.megan@epa.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). E-mailed offers will be accepted. Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the contracting officer, Megan Wallace, and Wallace.megan@epa.gov. No questions will be received after May 8, 2023. Point of Contact Megan Wallace Contracting Officer Wallace.megan@epa.gov Vendors conference: 04/20/2023 01:00 PM Location: Virtual via TEAMS Microsoft Teams meeting Call in (audio only) +1 513-769-4574,,790887739# United States, Cincinnati Phone Conference ID: 790 887 739# Or join on your computer, mobile app or room device Click here to join the meeting https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTQxNWQ5ODYtYmExNi00NWY5LWI1YTYtNmY3Yzg3MjU5NzIz%40thread.v2/0context=%7b%22Tid%22%3a%2288b378b3-6748-4867-acf9-76aacbeca6a7%22%2c%22Oid%22%3a%224da0d6cd-9542-46ff-9a64-1156c6e02c7f%22%7d Meeting ID: 282 733 166 666 Passcode: zSqTny Download Teams | Join on the web Join with a video conferencing device sip:teams@video.epa.gov Video Conference ID: 116 234 100 2 Alternate VTC instructions For all EPA meetings, there is no expectation of privacy regarding any communications. Participation in a recorded meeting will be deemed as consent to be recorded. Information on EPA systems is the property of the Agency and may become official records. The Contractor shall provide all personnel, labor, equipment, parts, tools, materials, vehicles, transportation, supervision, and services necessary to complete the work as described. It is the supplier's responsibility to ensure that all work meets applicable federal safety standards, OSHA requirements, state, county, and federal environmental regulations, including proper disposal of removal materials. The Contractor is responsible for providing labor, material, and equipment required to complete the following work: A. The Contractor shall retrofit the environmental chamber (Model # 18510-S, Serial # 931300670R-FN-1) located at the Human Studies Facility (HSF) third floor, room 301. The retrofit plan shall update the environmental chamber to its original design or better. See SOW Attachment 1 - Original Chamber Purpose. The chamber temperature shall operate at 4.4 with +/- 1 uniformity. At a minimum, the retrofit plan shall include replacement of conditioning equipment, evaporator cooler system, temperature control system and instrumentation, and chamber lighting. The Government shall approve review and approve proposed components prior to installation. B. Conditioning equipment includes rooftop condensing unit, refrigerant lines, temperature controlled by hot gas bypass, dehumidification by refrigeration and desiccant dryer. The contractor shall propose a complete HVAC system with a R448A refrigerant. Any building penetrations shall be resealed. Note: the humidity control system has been disabled and shall not be retrofitted. C. Evaporator cooler system includes unit coolers, evaporator coil, and fan motor. D. Temperature control system and instrumentation includes temperature control, temperature recorder and sensor, and alarm notification. The chamber temperature shall be monitored via chart recorder and/or digital monitoring and recording device integrated to the chamber control system. E. The chamber lighting shall match existing foot candle output and color. Chamber retrofit lighting shall be LED. Lighting fixtures shall be vapor proof. Fixtures shall have low temperature ballasts. Lighting components shall be easily replaceable by building owner. F. Testing Requirements: The following test shall be performed for 24 hours. The chamber shall maintain temperature as specified in Section III.A. During the testing duration, the chamber will be occupied by one person for five minutes with a minimum of 2 door openings and maximum of 8 door openings. The room temperature recovery time when opening or occupying the chamber shall be within 15 minutes. Simulate an out of tolerance temperature condition to verify the satisfactory operation of the alarm system. The chamber temperature shall be monitored via chart recorder or digital monitoring and recording device integrated to the chamber control system. The chamber retrofit shall not be accepted until satisfactory operation of the environmental chamber under the prescribed test requirements is observed and documented. G. The Contractor/Vendor shall warranty all work performed to be free of all material or workmanship defects for a period of no less than one year (12 months) from the day the project is determined complete by the EPA Contracting Officer Representative (COR). Warranty information and documentation shall be provided to the Government. H. The Contractor shall use the minimum number of proprietary systems, components or parts in the retrofit.

Post-Bid

Military

$300,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
119
Bidding Soon
1,741
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 9, 2023

June 8, 2023

August 7, 2023

img_map_placeholder

104 Mason Farm Rd, Chapel Hill, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.