Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 10, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Aurora, Nebraska. Working plans call for site work for a water / sewer project.
A. The work in this Section includes site dewatering necessary to lower and control groundwater level and hydrostatic pressure, and controlling the site drainage and surface water flows, to allow construction to be performed. 1. It is required that the groundwater level be lowered and maintained at the level necessary to provide a substantially dry and stable grade to allow subsequent operations to be performed. 2. The Contractor shall install all such dewatering equipment as may be necessary, throughout the duration of the project, to maintain the groundwater level, as required. 3. Contractor is responsible for controlling discharge rate and the dewatering systems effect on the groundwater level. 4. The Contractor shall intercept and divert site drainage and surface water flows away from excavations and trenches; using dikes, ditches, pipes, sumps, pumps or other means. 5. The Contractor shall remove standing water from trench or excavation with sumps, pumps and piping or other means. B. It shall be Contractor's responsibility to select materials, methods, and equipment, and design a dewatering system which will: 1. Provide a substantially dry and stable grade to allow subsequent operations to be performed. 2. Effectively reduce the hydrostatic pressure and lower the groundwater level, as required. 3. Not result in damage to adjacent properties, buildings, structures, utilities, private and public water wells, or other work, as a result of settlement, standing water or other groundwater-related effects. Approximately 400 LF of bank stabilization through grading, riprap installation, and permanent vegetation establishment. All bids rejected
Final Planning
Water / Sewer
$87,710.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2023
June 5, 2023
905 13th St, Aurora, NE
Related To This Project
Aurora, NE
Bid Date: Dec 04 2023
Aurora, NE
Bid Date: May 31 2023
Aurora, NE
Bid Date: Jun 25 2020
Aurora, NE
Bid Date: Jun 28 2018
Aurora, NE
Bid Date: Aug 24 2023
Aurora, NE
Bid Date: Aug 21 2023
Aurora, NE
Bid Date: Oct 02 2023
Aurora, NE
Bid Date: Mar 29 2023
Aurora, NE
Bid Date: May 15 2019
Aurora, NE
Bid Date: Dec 15 2022
Omaha, NE
Bid Date: May 03 2023
Dakota City, NE
Bid Date: May 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
