Demolition, site work, new construction, renovation and addition to a municipal facility in Palm Beach Gardens, Florida. Completed plans call for the addition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

The City seeks to hire a general contractor to construct certain modifications and expansions at the Burns Road Community Center. The Burns Road Community Center is located at 4404 Burns Road, Palm Beach Gardens, Florida and consists of a 43,114 SF building that includes two gymnasiums, dance room, art room, auditorium, locker rooms, and offices for the Recreation Department's administrative staff. Partial demolition of existing building. o Constructing the new community center building addition. o Mechanical systems upgrades, electrical upgrades, install new transformer, new generator, site work, chiller yard and associated utility connections. o Structure system for new additions, and structure opening between the new vestibule and the main gym; and between the lobby and the main gym. o Ensure all areas of the existing building to remain is restored to their original condition and fully operational, including finishes, electrical, mechanical, plumbing, fire alarm, and sprinklers. It is the responsibility of the contractor to ensure all relevant information is included in its response. All contractors are advised to carefully examine the requirements of this Invitation to Bid. Any questions regarding the completeness or substance of the requirements shall be submitted in writing via the e-procurement platform. The City of Palm Beach Gardens reserves the right to accept or reject any or all bids, in whole or in part, with or without cause, to waive any irregularities and/or technicalities, and to award the contract on such terms and conditions it deems will best serve the interests of the City. construction estimated to begin in September 2023. Completion- 540 calendar days ;The Project must be completed and ready to be open to the public by March 2025 Alternate 1: Construct a connection between the existing building and new addition, as described in the contract documents within sheets starting with "ALT1" designation and in engineering document as callouts. Alternate 1 will only be applicable if Alternate 2 is not accepted. Scope includes, but is not limited to: o Add exterior connector between new building and offices in existing to remain areas. o Add access from old gym to back side of locker rooms (include structure to add wall opening in gym wall). o Add access from corridor through one office (architecture and electrical, move light switch and exit signs). o Ensure all areas of the existing building to remain are restored to their original condition and fully operational, including finishes, electrical, mechanical, plumbing, fire alarm, and sprinklers. Alternate 2 - Daycare/Riverside Youth Enrichment Center and North Gym remodel as described in the contract documents in sheets starting with a letter designating the drawing series (A, M, E...EXT.) followed by numeral Two (2) and referred to as Phase 2. If Alternate 2 is accepted, Alternates 1 and 3 will not be accepted. Scope includes, but is not limited to: o Remodel existing North Gym. o Transform the South Gym and existing Administration area into a daycare and preschool. o Associated site work. o Ensure all areas of the existing building to remain are restored to their original condition and fully operational, including finishes, electrical, mechanical, plumbing, fire alarm, and sprinklers. Alternate 3 - Refinish both Gyms per plans. Finish the North Gym as described in Alternate 2 drawings. For the South Gym, use the plans mentioned above for reference. Alternate 3 will only be applicable if Alternate 2 is not accepted. Repaint both gyms according to plan. o Resurface flooring and markings with Robbins Plastic FL Resurfacing System in both gyms. o Replace lighting in both gyms. o Replace wall pads in both gyms. o Clean all ducts in both gyms. o Add Tectum sound panels in both gyms. o Ensure all areas of the existing building to remain are restored to their original condition and fully operational, including finishes, electrical, mechanical, plumbing, fire alarm, and sprinklers. UES Project No. 3330.2000251.0000 Rev #1

Award

Municipal

$19,964,050.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

333

29

312

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
61
Bidding Soon
1,066
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2023

September 8, 2023

img_map_placeholder

4404 Burns Rd, Palm Beach Gardens, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.