BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Site work and new construction of a fire / police facility in Palm Beach Gardens, Florida. Completed plans call for the construction of a 13,200-square-foot fire / police facility; and for site work for a fire / police facility.

As of October 9, 2025, the project was completed in June 2025. No further information is expected. The previous solicitation is for reference purposes only. The certified general contractor shall provide all construction services, including, but not limited to, labor, materials, supplies, supervision, sub-contractors, and related services and items to construct Fire Rescue Station No. 6 in the Avenir Development. The estimated final completion date shall not exceed 360 calendar days after date of the Purchase Order or Notice to Proceed, whichever is later. The Work of this Contract consists of the construction of a new 13,200 square foot, single story fire rescue facility in accordance with the following: The single story facility will include a three-bay apparatus room to house fire rescue equipment with adjacent bunker gear, decontamination room, waste collection and station storage. Additionally, the station will contain a public lobby, watch room, four (4) officer's quarters with bunk room and officer toilet, day room, kitchen, dining, eight (8) staff bunk rooms, gym, covered outdoor gym, laundry and support spaces. As of February 7, 2024, construction has commenced. Bids for Division 6 through 12 are being accepted under a separate listing. The Base Bid Scope of Work includes site preparation, cast structural concrete, masonry, structural steel, rough and finish carpentry, standing seam metal roof, caulking and sealants, impact resistant wood doors, hollow metal frames, aluminum storefront doors and frames, automatic door operators, finish hardware,glass and glazing, stucco, metal stud partitions, gypsum board, stucco, paint, ceramic tile, vinyl flooring, metal gear lockers, fire extinguishers, fire extinguisher cabinets, HVAC, plumbing fire protection and electrical as illustrated on Construction Documents prepared by Stephen Boruff, AIA, Architects + Planners, Inc., JLRD Inc., Consulting Engineers and InterConsult Engineers, LLC. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Occupancy

Fire / Police

$6,877,000.00

Public - City

New Construction, Site Work

167

57

121

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
123
Bidding Soon
1,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

January 22, 2024

Project location map

9669 Coconut Blvd, Palm Beach Gardens, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.