Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work and paving for a civil project in Lake Saint Louis, Missouri. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The project work shall include the following description of the work: Champagne Stormwater Improvement Project consists of the construction of approximately 297 linear feet of storm sewer ranging in diameter from 15 inches to 21 inches, curb inlets, double curb inlet, manhole, and removal and replacement of block retaining wall with end of pipe penetration. Project also includes removal of existing improvements and site restoration. Fernwood Stormwater Improvement Project consists of the construction of approximately 296 linear feet of storm sewer ranging in diameter from 36 inches to 42 inches, light stone revetment, area inlets, manhole, and junction box. Project also includes tree removal, removal of existing improvements, and site restoration. The contractor shall commence work within seven (7) days after the date of written notice from the Engineer to begin work and shall complete all work within 90 calendar days after the expiration date of such seven (7) day period. Any questions should be directed to Matt Kuelker, Sr. Project Manager, (636) 695-4221. The bid proposal shall be made on a form of proposal, provided in the specifications and delivered in a sealed envelope clearly marked on the outside Bid No. 02-25 to the City Clerk's Office on or before the time specified above. No facsimiles will be accepted. The proposal shall be accompanied by a bid bond, certified check or cashier's check of a bank or trust company in St. Charles County, St. Louis County, or in the City of St. Louis for an amount not less than five (5%) percent of the bid amount. The amount ofthe check shall be forfeited to the City if the bidder neglects or refuses to enter into a contract or to furnish bond aner his proposal has been accepted. The successful bidder shall furnish a perforrnance bond and payment bond for one hundred (100%) percent of the contract amount and shall file cenificates with the City that the bidder has obtained and will continue to carry workmen's compensation insurance, public and private liability, and property damage insurance, and builder's risk insurance in an adequate amount for the duration of the contract. He shall also file a surety bond for the guarantee of the work for a period of one (l) year aner the date of acceptance of the work. ADV-2

Award

Water / Sewer

$492,396.00

Public - City

Paving, Site Work

10

6

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
92
Bidding Soon
1,236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Multiple Locations, Lake Saint Louis, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.