Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 21, 2025 at 8:00 PM
Updated July 22, 2025
Site work and paving for a civil project in Lake Saint Louis, Missouri. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
The project work shall include the following description of the work: Champagne Stormwater Improvement Project consists of the construction of approximately 297 linear feet of storm sewer ranging in diameter from 15 inches to 21 inches, curb inlets, double curb inlet, manhole, and removal and replacement of block retaining wall with end of pipe penetration. Project also includes removal of existing improvements and site restoration. Fernwood Stormwater Improvement Project consists of the construction of approximately 296 linear feet of storm sewer ranging in diameter from 36 inches to 42 inches, light stone revetment, area inlets, manhole, and junction box. Project also includes tree removal, removal of existing improvements, and site restoration. The contractor shall commence work within seven (7) days after the date of written notice from the Engineer to begin work and shall complete all work within 90 calendar days after the expiration date of such seven (7) day period. Any questions should be directed to Matt Kuelker, Sr. Project Manager, (636) 695-4221. The bid proposal shall be made on a form of proposal, provided in the specifications and delivered in a sealed envelope clearly marked on the outside Bid No. 02-25 to the City Clerk's Office on or before the time specified above. No facsimiles will be accepted. The proposal shall be accompanied by a bid bond, certified check or cashier's check of a bank or trust company in St. Charles County, St. Louis County, or in the City of St. Louis for an amount not less than five (5%) percent of the bid amount. The amount ofthe check shall be forfeited to the City if the bidder neglects or refuses to enter into a contract or to furnish bond aner his proposal has been accepted. The successful bidder shall furnish a perforrnance bond and payment bond for one hundred (100%) percent of the contract amount and shall file cenificates with the City that the bidder has obtained and will continue to carry workmen's compensation insurance, public and private liability, and property damage insurance, and builder's risk insurance in an adequate amount for the duration of the contract. He shall also file a surety bond for the guarantee of the work for a period of one (l) year aner the date of acceptance of the work. ADV-2
Award
Water / Sewer
$492,396.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2025
July 7, 2025
Multiple Locations, Lake Saint Louis, MO
Related To This Project
Lake Saint Louis, MO
--
Lake Saint Louis, MO
Bid Date: Aug 17 2023
Lake Saint Louis, MO
Bid Date: Aug 18 2023
Lake Saint Louis, MO
Bid Date: Oct 30 2023
Lake Saint Louis, MO
Bid Date: Sep 26 2023
Lake Saint Louis, MO
--
Lake Saint Louis, MO
Bid Date: Jan 20 2022
Lake Saint Louis, MO
Bid Date: Feb 17 2022
Lake Saint Louis, MO
Bid Date: May 18 2023
Lake Saint Louis, MO
Bid Date: Apr 20 2023
Lake Saint Louis, MO
--
Lake Saint Louis, MO
--
Lake Saint Louis, MO
--
Lake Saint Louis, MO
--
Lake Saint Louis, MO
Bid Date: Apr 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
