Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a municipal facility in Deland, Florida. Completed plans call for the renovation of a municipal facility.
The County of Volusia is looking for a Contractor to supply all equipment, labor, materials, and supervision needed to replace one (1) 130 Ton Air-Cooled Chiller. The Contractor will be responsible to replace any ancillary items needed to properly connect and operate the new equipment. This project is located at the Deland Historic Courthouse Disconnecting of: existing chiller from electrical existing chilled water lines existing control voltage and Alerton BOS. Installation: new chiller reconnection of electrical reconnection of chilled water lines reconnection of control voltage and Alerton BOS Factory startup by Trane personnel Functional testing New system must be back online on the next business day after the weekend. Trane Equipment shall be the basis for design Control Systems Specialist, Inc. (CSSI) is the County of Volusia's sole source for building automation. Any integration or interlocking of devices shall be coordinated through CSSI. The selected prime mechanical contractor shall hire CSSI to perform the BOS Controls scope of work. Question Deadline 05/18/2023 at 11:30 PM ET Questions and exceptions shall be submitted by the question and answer deadline. Thereafter, no further questions or exceptions will be accepted or reviewed b A Bid bond shall accompany each Bid in an amount not less than five percent (5%) of the Bid amount Total contract time: 18 Days
Award
Municipal
$279,720.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2023
July 10, 2023
125 New York Ave W, Deland, FL
Related To This Project
Deland, FL
Bid Date: May 23 2023
Deland, FL
Bid Date: Jun 08 2023
Deland, FL
--
Deland, FL
Bid Date: Oct 01 2020
Deland, FL
Bid Date: Jun 22 2023
Deland, FL
Bid Date: Jun 06 2023
Deland, FL
Bid Date: Jun 29 2023
Deland, FL
Bid Date: May 02 2023
Deland, FL
Bid Date: May 11 2023
Deland, FL
Bid Date: Aug 08 2019
Deland, FL
Bid Date: May 11 2023
Deland, FL
Bid Date: May 04 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
