Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in Del Norte, Colorado. Completed plans call for site work for a municipal facility.
Award Details Contract Award Date: May 22, 2023 Contract Award Number: 1240LT23P0026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N44GA4K11PP7 Contractor Awarded Name: Cloud Crest Ranch LLC Contractor Awarded Address: Center, CO 81125-9320 USA Base and All Options Value (Total Contract Value): $36,000.00 This project is removal of old corral and installation of new corral. Contractor is responsible for deconstructing and removing old corral. Corral is constructed of old railroad ties, rough cut lumber and miscellaneous wire. New corral construction supplies will be provided. Contractor responsible for hauling material to project site from Monte Vista, CO at Forest Service Ad Site. Contractor responsible for providing all equipment to complete work such as welder, generator, welding supplies (sticks), fuel, trailer, and truck. New construction will follow blueprint attached. Construction will be drill stem posts with prefabricated continuous fence panels and hung gates. All welds should be structurally sound and clean. All posts and panels should be level and with a straight trajectory. All posts will be 2 3/8" drill stem sunk 3ft in the ground set in concrete. Holes should be 8" in diameter. Posts should be approximately 10ft spacing. Concrete fill will be 25lbs of dry concrete, mixed on site. On site water will be provided. Gate posts should be 15ft to accommodate the overhang. Continuous fence panels shall be at least 1 5/8" round, 10 ga. rails, with at least five (5) rails, 4ft tall, and 20ft in length. On metal posts metal plates for attaching the rails shall be welded to the post. Welded in at least 2 locations per panel to each metal line or gate post. Gates shall be heavy-duty steel with heavy-duty hinges to minimize sagging. Gates will be 12ft 14ga. Each gate will have a drill stem pipe overhang welded horizonal over the gate to support gate posts. Overhang will span post to post and be 12ft tall. The contractor will supply all labor for corral. The contractor is responsible for hauling all materials to the site. Equipment and supplies can be staged at the project location while work is being completed. MAGNITUDE OF CONSTRUCTION PROJECT : Between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions regarding this solicitation must be in writing and addressed to the Contracting Officer email Tanya Spanfellner, tanya.spanfellner@usda.gov
Award
Municipal
$36,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2023
June 12, 2023
Co Rd M 33, Del Norte, CO
Related To This Project
Del Norte, CO
Bid Date: Aug 21 2023
Del Norte, CO
Bid Date: Aug 16 2023
Del Norte, CO
Bid Date: Sep 18 2023
Del Norte, CO
Bid Date: Oct 18 2018
Del Norte, CO
Bid Date: Nov 03 2023
Del Norte, CO
Bid Date: Jun 24 2021
Del Norte, CO
Bid Date: Mar 28 2024
Del Norte, CO
Bid Date: Apr 11 2024
Del Norte, CO
Bid Date: Dec 09 2021
Del Norte, CO
Bid Date: Aug 16 2022
Del Norte, CO
Bid Date: Apr 19 2022
Del Norte, CO
Bid Date: Jan 16 2023
Westminster, CO
Bid Date: Apr 28 2023
Craig, CO
Bid Date: May 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.