BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a retail development in Cincinnati, Ohio. Working plans call for the demolition of a retail development; and for site work for a retail development.

*This project has been cancelled* Contractor is to provide construction services as outlined in this Solicitation. The intent of this project is the Demolition of a 2-Story building located in 1800 Sutter Avenue per drawing and specifications. Services to be provided will include, but are not limited to: 1. Apply for all applicable permits, bid shall include all applicable permit fees 2. Clear trash from existing basement 3. Cap utilities at property line 4. Remove portion of existing fence 5. Remove existing concrete steps around building 6. Remove existing concrete paving behind building 7. Remove portion of existing concrete walk in front of building 8. Remove portion of existing fence 9. Remove existing 2-story building, foundation to remain 10. Breakup basement concrete slab to ensure drainage 11. Backfill to match surrounding grade 12. Dispose debris and trash to comply with all applicable regulations. . If the Contractor fails reach Substantial Completion within the Contract Time for Substantial Completion, including any properly approved extension for the Contract Time for Substantial Completion, the Contractor shall pay to CMHA as Liquidated Damages, the sum of $150.00 for each day of delay. A. Liquidated Damages for the Date for Contract Completion and any Milestone Dates in the Contract, not including Substantial Completion, shall be assessed on in accordance. A written notice provided by CMHA to the apparent successful Bidder stating that upon satisfactory compliance with all conditions precedent for execution of a Contract within the time specified CMHA intends to execute a Contract with the Bidder. The contract performance period from the "Notice to Proceed" until substantial completion, will be 120 calendar days. Questions due prior to 4:00pm (local time) on:Tuesday May 9 at 4:00 p.m.

Final Planning

Retail

$200,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
55
Bidding Soon
1,318
All Active Projects
588
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 16, 2023

img_map_placeholder

1980 Sutter Ave, Cincinnati, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.