BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Mount Vernon, Illinois. Completed plans call for the construction of a transportation facility; for site work for a transportation facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Identification: Jefferson County Joint Operations Base, Mt. Vernon Outland Airport, Mt Vernon, Jefferson County, IL 62864 Project Description: Project shall include the furnishing of all equipment, materials, and labor to construct and place into satisfactory operation, a new aircraft storage hangar/building, aircraft ramp, parking lot, utility upgrades and associated site work, as described in the contract documents. Qualified bidders may submit bids for project as described in this Document. Submit bids according to the Instructions to Bidders. Owner: Mt. Vernon Airport Authority 1. Owner's Representative: Chris Collins, Phone: (618) 242-7016, E-mail: director@ mtvernonairport.com. Consultants: Hanson Professional Services, Inc. Springfield, IL. Barry Stolz, P.E. Phone: (314) 942- 5288, E-mail: bstolz@hanson.inc.com. Brian P. Edmison & Associates, LLC, Mt. Vernon, IL. Brian Ed mison, Phone: (618) 237-1564, E-mail: brian@bearchitecture.com, Owner will receive sealed lump sum bids until the bid time and date at the location IE-BID CONFERENCE A. None BID SECURITY A. Bid security shall be submitted with each bid in the amount of five (5) percent of the bid amount. No bids may be withdrawn for a period of 90 days after opening of bids. BIDDER'S QUALIFICATIONS A. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. Prequalification will be required in accordance with the Instructions to Bidders. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. TIME OF COMPLETION AND LIQUIDATED DAMAGES A. Successful bidder shall begin the Work on receipt of the No tice to Proceed and shall complete the Work within the Contract Time listed in the Instructions to Bidders. Work is subject to liquidated damages as listed in the Instructions to Bidders. Withdrawal Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

Post-Bid

Transportation Terminals

$730,000.00

Public - County

New Construction, Paving, Site Work

39

18

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
43
Bidding Soon
482
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

October 12, 2023

img_map_placeholder

100 Aviation Dr, Mount Vernon, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.