BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Norfolk, Virginia. Working plans call for site work for a water / sewer project.

The contractor shall install two new 210-ton refrigerant compressor equipment, provide hot gas piping and liquid refrigerant piping, pressure relief vent piping, electrical and control wiring and conduit. The contractor is responsible for reclaiming existing refrigerant and demo of existing piping. Contractor shall install new R-22 refrigerant monitoring and alarm system for the ice rink refrigerant system. Contractor shall provide all recommended scheduled maintenance and emergency service for twelve (12) months after installation. Question Submission Deadline:May 11, 2023, 4:00pm

Final Planning

Water / Sewer

$25,700.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
64
Bidding Soon
1,048
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

September 25, 2023

Project location map

201 E Brambleton Ave, Norfolk, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.