BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction, renovation and addition to a mixed-use development in Bloomington, Illinois. Conceptual plans call for the addition of a clubhouse / community center; for the construction of a clubhouse / community center; for the renovation of a clubhouse / community center; golf course; and for site work for a clubhouse / community center.

Highland Park Golf Course is the oldest public course in our county. It currently still utilizes two of the original buildings of the Meyer Brewing Company that was in business back in the 1800's. Accordingly, one of these buildings (Shed 1) is no longer fit and safe to inhabit. It currently contains approximately half our golf cart fleet but cannot serve any other purpose. The other original building is currently used for the pro shop and while still in good condition, it is not handicap accessible and is very costly to heat and cool. Razing Shed 1 and replacing it with a new cost-friendly building will allow us store all our golf carts in one building, freeing up space in Shed 2 for our maintenance staff to fully use. Most importantly, it will allow us to move the pro shop out if it's current building providing handicap accessibility. The current pro shop will be able to be used for post round gatherings, special events, etc.. The new pro shop will also allow operations to be run with less staff saving rising labor costs. Operating Impact: This investment will create efficiencies by replacing a building in disrepair, updating the existing clubhouse and cart storage to one location and the old clubhouse maybe utilized for post round gatherings/rent for gatherings. As of April 27, 2023, this project is included in the City of Bloomington's FY 2024-2028 Capital Improvement Program and funding for construction is allotted for FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Golf Course

$590,000.00

Public - City

Addition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
34
Bidding Soon
481
All Active Projects
223
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2023

img_map_placeholder

1613 S Main St, Bloomington, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.