Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Florence, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Any questions concerning bids shall be directed to the City Clerk at email address cortlyne.huppe@florencecolorado.org. The work generally includes: A. Coordinating work activities with the adjacent and neighboring property owner and tenants. B. Provide traffic control and detour signage. C. Removal and disposal (at an approved site) of existing sidewalk, street asphalt, and unsuitable or excess base material within the area shown on the plan set. D. Verify suitability of underlying soil to support finished work and over excavate areas of poor soil conditions and backfill with crushed stone or compacted sub-base material where directed by City. E. Backfill and compact exposed area per plan set and street standards. . Compaction with rubber wheels will not be accepted. Proof rolling by heavy vehicle is required. No concrete or asphalt shall be placed until contractor provides minimum of two successful compaction tests by a qualified testing firm in areas with 12-inches or more of compacted fill. F. Provide expansion/contraction joints matching adjacent slab sections, and matching detail sheets. G. Stamp finished concrete work at maximum 50-feet intervals with Contractor's name and year of construction in letters 1-inch high by 1/4 -inch deep. H. Provide site cleanup, removal and off-site disposal of all debris remaining from this work. The City of Florence will accept sealed bids for the following general scope of work for completion within sixty (60) calendar days after Notice To Proceed. Five (5) percent bid bond is required with the bid. 100% performance and payment bonds are required. This project will remove and dispose of existing sidewalks and street asphalt, regrade the intersection, and re-construct sidewalks and pavement for ADA compliance and improved drainage at the intersection of East 5th Street with Oriole Road. Any questions concerning bids shall be directed to the City Clerk at email address cortlyne.huppe@florencecolorado.org. Liquidated damages: Overall Project: Unless the contract completion date listed in the Notice to Proceed is extended by mutual agreement in a Change Order, the contracted work must be completed within sixty (60) of the Notice to Proceed. If work is not substantially completed by said completion date, The Contractor shall pay the City liquidated damages for delay, in the amount of two hundred and fifty ($250.00) dollars for each day that work remains uncompleted. Work shall not be considered substantially complete until all surfaces within the construction area are finished, cured, and placed in full use and operation.
Award
Roads / Highways
$198,330.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
July 3, 2023
Oriole Rd & E 5th St, Florence, CO
Related To This Project
Florence, CO
--
Florence, CO
Bid Date: Jul 20 2023
Florence, CO
--
Florence, CO
Bid Date: Jul 28 2023
Florence, CO
--
Florence, CO
Bid Date: Feb 14 2022
Florence, CO
Bid Date: Jan 31 2022
Florence, CO
Bid Date: Mar 29 2022
Florence, CO
Bid Date: Aug 29 2023
Florence, CO
Bid Date: Apr 27 2023
Florence, CO
Bid Date: Jun 20 2023
Florence, CO
Bid Date: May 04 2023
Florence, CO
Bid Date: Dec 01 2022
Florence, CO
Bid Date: Sep 21 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
