BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and paving for a mixed-use development in Stoughton, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work for which bids are asked includes the following: Construction of a new 10-foot wide asphalt Multi-Use Trail. Trail Signage, Pedestrian Guardrail, and Boulder Retaining Wall. Other miscellaneous items: storm sewer adjustments, concrete sidewalk and path connections, concrete path ramps with detectable warning fields, erosion control, traffic control, unclassified excavation, and turf and site restoration. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Bid Results

Sidewalks / Parking Lot

$770,912.00

Public - City

Paving, Site Work

45

11

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
156
Bidding Soon
2,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 15, 2023

Project location map

Multiple Locations, Stoughton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.