BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Canon City, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000318903 Question Acceptance Deadline 05/26/2023 01:00 PM MT Questions are submitted online No A General Contract for the reconstruction of approximately 0.6 miles of roadway in Cañon City, Colorado. The Project will entail the construction of associated curb and gutter, sidewalk, irrigation improvements, reconstruction of the existing roadway, and other work incidental to completion. Buyer's Requirements General Requirements - Contractors License Required - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Contact Information Ted Dell 719-276-5240 tjdell@canoncity.org Leo Evans 719-276-5291 laevans@canoncity.org COLLEGE AVE- N 3 RD ST TO N 9 TH ST (PROJECT # 94011) FRANKLIN AVE- N 19 TH ST TO ORCHARD AVE (PROJECT # 94013) k. Contractor shall perform the following described work (the Project), in accordance with this Contract and the Contract Documents, attached hereto and incorporated herein by this reference: PROJECT NAME: Bid 45-23; 2A-2023 COLLEGE AVE ROAD RECON. SCH A: PROJECT # 94011 COLLEGE AVE- N 3 RD ST TO N 9 TH ST SCH A1: PROJECT # 94013 FRANKLIN AVE- N 19 th ST TO N ORCHARD AVE 2. Bonds. Within ten (10) days of the date of this Contract, Contractor shall provide the payment and performance bond and certificate of insurance required by the Contract Documents. 3. Commencement and Completion of Work. Contractor shall commence the Project within ten (10) days of date of the Notice to Proceed. Substantial Completion of the Project shall be accomplished within XXXX (XX) days of the Notice to Proceed date, unless the period for completion is extended otherwise in accordance with the Contract Documents. Final Completion of the Project shall be accomplished within twenty-one (21) days of the date of Substantial Completion. 4. Compensation/Contract Price. Th

Award

Roads / Highways

$1,362,991.00

Public - City

Paving, Site Work

82

8

10

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
10
Bidding Soon
249
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

img_map_placeholder

Multiple Locations, Canon City, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.