BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated October 23, 2025

Site work, renovation and addition to a library in Westford, Massachusetts. Completed plans call for the addition of a library; for the renovation of a library; and for site work for a library.

The JV Fletcher Public Library, in Westford, MA (the project) consists of the partial demolition, and construction of a new three-story, steel framed addition to the existing historic Library, minor restoration, and renovations to existing historic Library. The new addition will have concrete foundations, concrete slab-on-grade first floor, and an elevated slab at the second & third floors, new paved parking lot, and associated sitework. The addition will be clad with brick and metal panel siding, and include aluminum windows, both shingle roofing and flat roof membrane. Sitework includes but is not necessarily limited to: demolition of an existing 2-story wood and masonry framed addition, with concrete foundations, tree and brush clearing, excavation, grading, drainage, and underground utility systems, demolition of the parking lots and paving, new bituminous concrete roadways and parking areas, granite curbing, landscaping, concrete pavers, modular retaining wall, fencing/guardrails and site furnishings, and work throughout the site. The building includes but is not necessarily limited to; insulation, Louvers, new wood and hollow metal doors, metal stud gypsum drywall partitions, carpet, various millwork, cabinetry and trim, restroom finishes, window treatments. Question Deadline 03/13/2025 at 2:00 PM ET All bidding Requests for Information (RFIs) shall be submitted online Hazardous Materials abatement, partial demolition of the existing building, consisting mainly of a prior addition. Cutting and patching within the remaining portion of the building, and new and restored finishes. The Owner will vacate the building during the Work and the Contractor will have access to the entire site. The project size is approximately 35,478 SF. This project is classified as Level 3 Alterations under the building code and will comply with the appropriate code sections accordingly. MBE: 4.9% WBE: 8.1% VBE/SDV OBE: 3%

Award

Library

$20,471,634.00

Public - City

Addition, Renovation, Site Work

250

35

149

8

Subscribe For Documents

129 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
362
Bidding Soon
4,666
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

May 19, 2025

Project location map

50 Main St, Westford, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.