Demolition, site work and new construction of a fire / police facility in Centennial, Colorado. Completed plans call for the demolition of a fire / police facility; for the construction of a 11,464-square-foot fire / police facility; and for site work for a fire / police facility.

Project has been awarded but award amount not confirmed. https://www.summitdaily.com/news/silverthorne-fire-station-construction-plans-pushed-to-2024-after-selecting-contractor-for-the-project/ A new Silverthorne Fire Station will not break ground until early 2024, a few months later than Summit Fire & EMS leadership had previously stated, according to a spokesperson for the fire district. Back in January, Summit Fire & EMS said crews could break ground on the new station by this fall, but the fire protection district has just recently selected Denver-based Hyder Construction as the general contractor on the project, spokesperson Steve Lipsher said. “This was just a more detailed look at what it truly was going to take before we can get started moving dirt and putting up walls,” Lipsher said. “It was our aspiration — and still is — to be pushing this project forward as quickly as possible.” ummit Fire & EMS operates four fully-staffed stations located in Dillon, Keystone, Frisco and Copper Mountain but does not have an operable station in Silverthorne. The lack of a staffed station in Silverthorne has led some resident’s to raise concerns about emergency response times, especially when traffic is congested near Interstate 70. The new fire station is expected to cost between $6 million and $8 million, and a contract with Hyder Construction is anticipated to be completed by next month, according to the Summit Fire & EMS webpage for the project. It will be constructed adjacent to the existing Silverthorne Public Works building off Colorado Highway 9, also known as Blue River Parkway. ................................................................................................................. Reference Number 0000319272 The Project generally includes: abatement and demolition of the existing fire station, site development, new utilities, construction of the new fire station and site improvements including but not limited to asphalt, concrete curb and gutter, retaining walls, landscape and irrigation. The construction budget is approximately $8,000,000. The entire project shall achieve Substantial Completion and be operational on or before September 13, 2024. Project #: 5997.00 Reference attached SMFR - ST 15 - GC Request for Proposal - 5-4-23 for additional information. General Requirements - Bidder Prequalification/Preregistration Required - Contractors License Required - Insurance Required Every request for interpretation shall be in writing, addressed to the Owner's Representative and submitted via BidNet Direct. To be given consideration, requests must be received before 3:00 PM (local time) on Tuesday, May 23, 2023. Any and all interpretations and supplement *AD Miller is requesting their bids June 2, 2023 by 3 pm. *As of May 30, 2023, addendum 3 has been issued.

Award

Fire / Police

$8,000,000.00

Public - County

Demolition, New Construction, Site Work

155

34

38

7

Subscribe For Documents

140 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
58
Bidding Soon
1,004
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

June 20, 2023

img_map_placeholder

2702 E Dry Creek Rd, Centennial, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.