BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Centennial, Colorado. Completed plans call for site work for a bridge / tunnel.

Reference Number 0000323429 Colorado Boulevard Bridge Approach Slab Repairs Question Acceptance Deadline 06/28/2023 07:00 PM EDT Questions are submitted online Yes Polyurethane Stabilization (Pavement Lifting) ofthe Colorado BoulevardBridge at Big Dry Creek, north and south approach slabs and asphalt pavement. The existing approach slabs, sleeper slabs, and adjacent pavement / sidewalk have settled approximately 5", the polyurethane stabilization (Pavement Lifting) is proposed to reduce future settlement and raise the pavement to provide a smooth transition from the bridge to the surrounding asphalt pavement.

Bid Results

Bridges / Tunnels

$274,045.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
94
Bidding Soon
1,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2023

August 7, 2023

Project location map

Multiple Locations, Centennial, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.