Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Imperial, Missouri. Completed plans call for site work for a road / highway.
Improvements to Seckman Road at Mastodon State Park Entrance and through the State Park. Improvements include a new horizontal and vertical alignment at the Park Entrance to provide for adequate sight distances, the addition of a left turn lane into the park entrance, adding full depth 8' paved shoulders to the South Side of Seckman Road, while also adding curb and gutter sections on the North Side of Seckman Road, raising Seckman Road to the 100 year flood plain elevation, enclosed drainage structures and piping, large block retaining wall systems, vertical concrete barrier walls, an asphalt overlay along with new pavement striping. The project limits begin at the park entrance just east of the Summer field Subdivision to the West Outer Road. Total project length for Phase 3 is 1,370', & Phase 4 - 3,580 - combined 4,950'. This is a two project - required combination bid
Bid Results
Roads / Highways
$4,207,375.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
July 6, 2023
Seckman Rd, Imperial, MO
Related To This Project
Imperial, MO
--
Imperial, MO
--
Imperial, MO
Bid Date: Oct 31 2023
Imperial, MO
Bid Date: Apr 06 2021
Imperial, MO
Bid Date: Dec 12 2023
Imperial, MO
Bid Date: Dec 13 2023
Imperial, MO
Bid Date: Dec 05 2023
Imperial, MO
Bid Date: Mar 07 2024
Imperial, MO
Bid Date: Apr 04 2023
Imperial, MO
Bid Date: Feb 24 2023
Imperial, MO
Bid Date: Feb 08 2022
Imperial, MO
Bid Date: May 16 2023
Salem, MO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
