BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Imperial, Missouri. Completed plans call for site work for a road / highway.

Improvements to Seckman Road at Mastodon State Park Entrance and through the State Park. Improvements include a new horizontal and vertical alignment at the Park Entrance to provide for adequate sight distances, the addition of a left turn lane into the park entrance, adding full depth 8' paved shoulders to the South Side of Seckman Road, while also adding curb and gutter sections on the North Side of Seckman Road, raising Seckman Road to the 100 year flood plain elevation, enclosed drainage structures and piping, large block retaining wall systems, vertical concrete barrier walls, an asphalt overlay along with new pavement striping. The project limits begin at the park entrance just east of the Summer field Subdivision to the West Outer Road. Total project length for Phase 3 is 1,370', & Phase 4 - 3,580 - combined 4,950'. This is a two project - required combination bid

Bid Results

Roads / Highways

$4,207,375.00

Public - County

Paving, Site Work

112

7

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
42
Bidding Soon
847
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.