BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Brooklyn Center, Minnesota. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

State EEO regulations and goals and labor provisions apply to this Project. LOCATED ON 50TH AVENUE NORTH 51 ST AVENUE NORTH KNOX AVENUE JAMES AVENUE 54TH AVENUE NORTH GRANDVIEW SOUTH AREA The project shall consist of the following approximate quantities: Excavation: 1,800 C.Y. Bituminous Pavement Reclamation:15,750 S.Y. RC Pipe Storm Sewer: 60 L.F. Bituminous Pavement: 3,780 TON Construct Drainage Structure: 12 L.F. Concrete Curb and Gutter: 3,415 L.F. Ductile Iron Watermain: 1,020 L.F. Concrete Sidewalk: 1,215 S.F. Hydrant: 8 E.A. Sodding: 2,480 S.Y. 1" Type K Copper Pipe: 280 L.F. Striping: 940 L.F This project generally consists of street and utility reconstruction work within the project areas as shown on the plans. The proposed work is generally described as follows: Remove bituminous surface, remove and replace areas of storm sewer, install temporary water systems, remove and replace areas of watermain, hydrants, services and valves. Repair driveway aprons, curbs & gutters and sidewalks. Install bituminous surfacing, striping, and restore all disturbed areas with lawn sod. Bidders shall bring any inadequacies, omissions, or conflicts to the City Engineer's attention at least seven (7) days before the due date for Bids. P

Award

Roads / Highways

$1,798,252.00

Public - City

Paving, Site Work

57

8

13

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
166
Bidding Soon
1,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

Project location map

Multiple Locations, Brooklyn Center, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.