EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Brooklyn Center, Minnesota. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

State EEO regulations and goals and labor provisions apply to this Project. LOCATED ON 50TH AVENUE NORTH 51 ST AVENUE NORTH KNOX AVENUE JAMES AVENUE 54TH AVENUE NORTH GRANDVIEW SOUTH AREA The project shall consist of the following approximate quantities: Excavation: 1,800 C.Y. Bituminous Pavement Reclamation:15,750 S.Y. RC Pipe Storm Sewer: 60 L.F. Bituminous Pavement: 3,780 TON Construct Drainage Structure: 12 L.F. Concrete Curb and Gutter: 3,415 L.F. Ductile Iron Watermain: 1,020 L.F. Concrete Sidewalk: 1,215 S.F. Hydrant: 8 E.A. Sodding: 2,480 S.Y. 1" Type K Copper Pipe: 280 L.F. Striping: 940 L.F This project generally consists of street and utility reconstruction work within the project areas as shown on the plans. The proposed work is generally described as follows: Remove bituminous surface, remove and replace areas of storm sewer, install temporary water systems, remove and replace areas of watermain, hydrants, services and valves. Repair driveway aprons, curbs & gutters and sidewalks. Install bituminous surfacing, striping, and restore all disturbed areas with lawn sod. Bidders shall bring any inadequacies, omissions, or conflicts to the City Engineer's attention at least seven (7) days before the due date for Bids. P

Award

Roads / Highways

$1,798,252.00

Public - City

Paving, Site Work

57

8

13

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Site Maintenance
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
75
Bidding Soon
893
All Active Projects
460
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

img_map_placeholder

Multiple Locations, Brooklyn Center, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Street and Utility Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.