Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in University Park, Illinois. Completed plans call for the renovation of a playground / park / athletic field.
As of June 30, 2023, project was awarded to Blue Ridge Docks, awarded amount is $51,859.93. The Village of University Park has issued a Request for Proposals (RFP) for the dock replacement at Pine Lake Park. Bid s received after that time will not be accepted or reviewed. The selected contractor will be required to complete the full removal of the two docks present at the lake currently and replace both docks with ADA compliant floating docks in the same locations unless otherwise specified. A stick-built design similar to existing docks is requested. Product specifications should be provided for the proposed replacement including any proposed materials, dimensions, and quantities should be clearly identified in proposal responses. Furthermore, the proposed replacements should be similar in size to those existing contingent upon necessary differences to incorporate ADA compliant components. Existing docks are estimated to be 280 sf (35 ft length, 8 ft width) with an estimated 12-15 ft depth as a reference point. Proposed tasks include: Removal of all existing dock materials and related debris; Disposal of all waste materials; and, Replacement of comparably sized ADA compliant docks. Preliminary planning estimates ranged significantly between $15,000 - $40,000 per dock. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due: Wednesday, May 10th, 2023 by 5:00 pm (CST)
Award
Playgrounds / Parks / Athletic Fields
$51,860.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 25, 2023
June 26, 2023
24600 S Steger Monee Rd, University Park, IL
Related To This Project
University Park, IL
--
University Park, IL
Bid Date: Jul 18 2023
University Park, IL
Bid Date: Aug 22 2023
University Park, IL
Bid Date: Aug 22 2023
University Park, IL
--
RFP D/B - Design Build Services for Rehabilitation and Reactivation of Riegel Farm Stage 2 - 5156825
University Park, IL
Bid Date: Jan 15 2024
University Park, IL
Bid Date: Sep 19 2022
University Park, IL
Bid Date: Jan 15 2024
University Park, IL
Bid Date: May 02 2023
University Park, IL
Bid Date: Jan 28 2021
University Park, IL
Bid Date: Oct 15 2019
University Park, IL
Bid Date: Oct 28 2019
University Park, IL
Bid Date: Feb 03 2021
University Park, IL
Bid Date: Aug 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.