BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and outdoor lighting for a municipal facility in Hilo, Hawaii. Completed plans call for site work for a municipal facility; and for outdoor lighting for a municipal facility.

The scope of work for this project consists of replacing seven light poles, concrete pedestals and associated electrical work, and recoating three existing light poles at Pier 1, Hilo Harbor, Hawaii. Mobilization shall include setting up, ready for use, all plant, equipment and necessary materials at the job site. Providing temporary barricades as required for Harbor operations during construction. Moving the barricades back to their original position upon completion of work. Demobilization shall include the removal of all the Contractor's plant and equipment and surplus material from the job site. The cleanup of the job site, to the Harbors Construction Engineer, shall also be included in this article. If there are any questions, please contact Mr. Branden Sumida, Project Engineer, by email at branden.sumida@hawaii.gov. All questions and requests for information (RFI) applicable to the bid documents shall be submitted via HIePRO no later than 14 calendar days before bid opening. Questions received after the deadline will not be addressed. Verbal RFI will not receive a response. A 5% bid adjustment for bidders that are parties to apprenticeship agreements pursuant to 103D-55.6, Hawaii Revised Statutes (HRS), is applicable to this project. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. *The estimated construction cost is between $500,000 and $800,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 05/26/2023 All questions and requests for information (RFI) applicable to the bid documents shall be submitted via HIePRO no later than 14 calendar days before bid opening. Questions received after the deadline will not be addressed. Verbal RFI will not receive a response. A. Mobilization and demobilization. B. Replacing seven light poles, concrete pedestals, and related appurtenances and associated electrical work. C. Recoating three light poles, concrete pedestals, and related appurtenances.

Award

Municipal

$854,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

21

6

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
3
Bidding Soon
73
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

July 10, 2023

Project location map

100 Kuhio St, Hilo, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.